{"id":53514,"date":"2026-08-06T13:52:33","date_gmt":"2026-08-06T17:52:33","guid":{"rendered":"https:\/\/www.millerthomson.com\/?p=53514"},"modified":"2026-08-06T13:52:38","modified_gmt":"2026-08-06T17:52:38","slug":"reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs","status":"publish","type":"post","link":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/","title":{"rendered":"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs"},"content":{"rendered":"\n<p>Les entrepreneurs albertains qui ex\u00e9cutent des travaux dans le cadre de projets de construction constituant des \u00ab&nbsp;travaux publics&nbsp;\u00bb au sens de la Public Works Act (la \u00ab&nbsp;Loi<a href=\"#_ftn1\" id=\"_ftnref1\">[1]<\/a>&nbsp;\u00bb) se heurtent souvent \u00e0 des difficult\u00e9s. Plus particuli\u00e8rement, bien que la Loi \u00e9tablisse un processus de r\u00e9clamation, elle ne fixe aucun d\u00e9lai l\u00e9gal pour saisir le tribunal d\u2019une r\u00e9clamation afin de la faire ex\u00e9cuter. Elle ne pr\u00e9voit pas non plus de recours en cas d\u2019enregistrement irr\u00e9gulier d\u2019une r\u00e9clamation ou lorsque les montants r\u00e9clam\u00e9s sont largement sup\u00e9rieurs aux sommes r\u00e9ellement dues. Ainsi, lorsqu\u2019une r\u00e9clamation est d\u00e9pos\u00e9e en vertu de la <em>Public Works Act<\/em>, les paiements relatifs au projet de travaux publics \u2013 dont la province de l\u2019Alberta est propri\u00e9taire \u2013 sont g\u00e9n\u00e9ralement suspendus ou r\u00e9duits, et l\u2019entrepreneur dispose de tr\u00e8s peu de recours pour rem\u00e9dier \u00e0 la situation. Il s\u2019agit bien entendu de l\u2019objectif de la Loi, mais la situation devient probl\u00e9matique lorsque les r\u00e9clamations sont irr\u00e9guli\u00e8res ou portent sur des montants injustifi\u00e9s.<\/p>\n\n\n\n<p>R\u00e9cemment, le groupe Construction et infrastructures de Miller Thomson a r\u00e9sum\u00e9 une d\u00e9cision digne de mention de la Cour du Banc du Roi de l\u2019Alberta, <a href=\"https:\/\/www.canlii.org\/en\/ab\/abkb\/doc\/2025\/2025abkb623\/2025abkb623.html?resultId=903560c6fd684777a70904b6e40d34e2&amp;searchId=2026-05-05T11:20:28:880\/9d9133a99ba948b6ab42a33b33b92fbe&amp;searchUrlHash=AAAAAQBKT3BhYmluIFNhbmQgYW5kIEdyYXZlbCBJbmMuIHYgVHN1dSBU4oCZaW5hIENvbnRyYWN0aW5nIExpbWl0ZWQgUGFydG5lcnNoaXAAAAAAAQ\"><em>Opabin Sand and Gravel Inc. c. Tsuu T\u2019ina Contracting Limited Partnership<\/em><\/a><a href=\"#_ftn2\" id=\"_ftnref2\">[2]<\/a>, dans laquelle la Cour a conclu qu\u2019une action en responsabilit\u00e9 d\u00e9lictuelle pouvait \u00eatre intent\u00e9e contre les parties \u00e0 un projet de construction qui pr\u00e9sentent, en vertu de la Public Works Act, des r\u00e9clamations ne respectant pas les dispositions de cette loi quant aux d\u00e9lais applicables et \u00e0 l\u2019admissibilit\u00e9 de telles r\u00e9clamations.<\/p>\n\n\n\n<p>Toutefois, la Cour d\u2019appel de l\u2019Alberta (la \u00ab&nbsp;<strong>Cour<\/strong>&nbsp;\u00bb) a r\u00e9cemment infirm\u00e9 la d\u00e9cision du tribunal inf\u00e9rieur, concluant que le d\u00e9lit civil d\u2019abus de proc\u00e9dure n\u2019avait pas \u00e9t\u00e9 \u00e9tabli dans les circonstances<a href=\"#_ftn3\" id=\"_ftnref3\">[3]<\/a>. La Cour a conclu que l\u2019intim\u00e9e, Vinci Geoinfrastructure Canada Limited (\u00ab&nbsp;<strong>Vinci<\/strong>&nbsp;\u00bb), n\u2019avait pas d\u00e9montr\u00e9 que la r\u00e9clamation d\u00e9pos\u00e9e en vertu de la <em>Public Works Act<\/em> par l\u2019appelante, Opabin Sand and Gravel Inc. (\u00ab&nbsp;<strong>Opabin<\/strong>&nbsp;\u00bb), constituait une proc\u00e9dure judiciaire engag\u00e9e principalement dans le but de favoriser la r\u00e9alisation d\u2019un objectif indirect, accessoire et ill\u00e9gitime, ni qu\u2019Opabin avait, en pr\u00e9sentant cette r\u00e9clamation, pos\u00e9 un acte pr\u00e9cis ou prof\u00e9r\u00e9 une menace concr\u00e8te en vue de r\u00e9aliser cet objectif ill\u00e9gitime<a href=\"#_ftn4\" id=\"_ftnref4\">[4]<\/a>. La Cour a donc conclu que la demande reconventionnelle modifi\u00e9e ne r\u00e9v\u00e9lait aucune cause d\u2019action raisonnable fond\u00e9e sur l\u2019abus de proc\u00e9dure.<\/p>\n\n\n\n<p>Cette d\u00e9cision rev\u00eat une grande importance pour les entrepreneurs albertains qui ex\u00e9cutent des travaux publics, puisqu\u2019elle confirme que les recours en common law peuvent ne pas \u00eatre disponibles lorsqu\u2019une r\u00e9clamation irr\u00e9guli\u00e8re est d\u00e9pos\u00e9e en vertu de la <em>Public Works Act<\/em>. Par cons\u00e9quent, les entrepreneurs pourraient continuer d\u2019\u00e9prouver des difficult\u00e9s \u00e0 obtenir paiement lorsqu\u2019une r\u00e9clamation est pr\u00e9sent\u00e9e en vertu de la Loi.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Contexte\u00a0: la r\u00e9clamation en vertu de la <em>Public Works Act<\/em><\/h2>\n\n\n\n<p>Vinci a \u00e9t\u00e9 retenue par Sa Majest\u00e9 le Roi du chef de l\u2019Alberta (la \u00ab&nbsp;<strong>Couronne<\/strong>&nbsp;\u00bb) \u00e0 titre d\u2019entrepreneur g\u00e9n\u00e9ral pour un projet de construction visant le r\u00e9servoir hors cours d\u2019eau de Springbank (le \u00ab&nbsp;<strong>projet SR1<\/strong>&nbsp;\u00bb), entrepris par le gouvernement de l\u2019Alberta afin de prot\u00e9ger la ville de Calgary et les r\u00e9gions avoisinantes contre les inondations<a href=\"#_ftn5\" id=\"_ftnref5\">[5]<\/a>. Le projet SR1 constituait un \u00ab&nbsp;ouvrage public&nbsp;\u00bb au sens de la <em>Public Works Act<\/em><a href=\"#_ftn6\" id=\"_ftnref6\">[6]<\/a><em>.<\/em><\/p>\n\n\n\n<p>La Couronne a c\u00e9d\u00e9 \u00e0 Vinci des contrats de sous-traitance relatifs \u00e0 la fourniture de mat\u00e9riaux par un tiers, Sarcee Gravel Products Ltd. (\u00ab&nbsp;<strong>Sarcee<\/strong><a href=\"#_ftn7\" id=\"_ftnref7\">[7]<\/a>&nbsp;\u00bb). Lorsque Sarcee a \u00e9prouv\u00e9 des difficult\u00e9s \u00e0 s\u2019acquitter de ses obligations contractuelles, elle a transmis des bons de commande \u00e0 Opabin afin d\u2019obtenir les mat\u00e9riaux n\u00e9cessaires, qu\u2019Opabin lui a fournis<a href=\"#_ftn8\" id=\"_ftnref8\">[8]<\/a>.<\/p>\n\n\n\n<p>Sur les instructions de Vinci, Sarcee n\u2019a transmis aucun autre bon de commande \u00e0 Opabin. Opabin a all\u00e9gu\u00e9 que les instructions de Vinci constituaient une violation de l\u2019entente intervenue entre les parties, puisque celles-ci avaient convenu qu\u2019Opabin reprendrait la fourniture des mat\u00e9riaux au printemps 2023 et qu\u2019Opabin aurait engag\u00e9 des d\u00e9penses suppl\u00e9mentaires en se fondant sur cette entente<a href=\"#_ftn9\" id=\"_ftnref9\">[9]<\/a>.<\/p>\n\n\n\n<p>En juillet 2023, Opabin a remis \u00e0 la Couronne un avis de r\u00e9clamation concernant le projet, d\u2019un montant d\u2019environ 9\u2009000\u2009000&nbsp;$. La Couronne a alors retenu les paiements progressifs dus \u00e0 Vinci et ne les a vers\u00e9s qu\u2019apr\u00e8s que celle-ci eut obtenu une lettre de cr\u00e9dit \u00e0 titre de garantie<a href=\"#_ftn10\" id=\"_ftnref10\">[10]<\/a>. Opabin a par la suite d\u00e9pos\u00e9 une d\u00e9claration contre Vinci et d\u2019autres parties relativement au projet.<\/p>\n\n\n\n<p>Vinci a pr\u00e9sent\u00e9 une demande reconventionnelle contre Opabin, all\u00e9guant que celle-ci avait engag\u00e9 sa responsabilit\u00e9 pour abus de proc\u00e9dure et d\u00e9tournement (la \u00ab&nbsp;<strong>demande reconventionnelle<\/strong><a href=\"#_ftn11\" id=\"_ftnref11\">[11]<\/a><strong>&nbsp;<\/strong>\u00bb). Plus pr\u00e9cis\u00e9ment, Vinci a all\u00e9gu\u00e9 que la d\u00e9claration et l\u2019avis remis \u00e0 la Couronne en vertu de la <em>Public Works Act<\/em> \u00ab&nbsp;avaient \u00e9t\u00e9 pr\u00e9sent\u00e9s dans le&nbsp;but ill\u00e9gitime de tirer parti des pressions \u00e9conomiques d\u00e9coulant de la retenue des paiements progressifs r\u00e9sultant de la r\u00e9clamation d\u2019Opabin [fond\u00e9e sur la Public Works Act] afin de faire ind\u00fbment pression sur Sarcee pour qu\u2019elle acquiesce aux demandes d\u2019indemnisation d\u2019Opabin ou, \u00e0 d\u00e9faut, pour obtenir d\u2019autres contrats d\u2019approvisionnement&nbsp;\u00bb relativement au projet<a href=\"#_ftn12\" id=\"_ftnref12\">[12]<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">D\u00e9cisions des tribunaux inf\u00e9rieurs<\/h2>\n\n\n\n<p>Opabin a demand\u00e9 la radiation de la demande reconventionnelle fond\u00e9e sur l\u2019abus de proc\u00e9dure, au motif qu\u2019elle ne r\u00e9v\u00e9lait aucune cause d\u2019action raisonnable, conform\u00e9ment \u00e0 l\u2019alin\u00e9a 3.68(2)b) des <em>R\u00e8gles de proc\u00e9dure de l\u2019Alberta<\/em>. Le juge charg\u00e9 des requ\u00eates a conclu que la demande reconventionnelle devait \u00eatre radi\u00e9e, puisque \u00ab&nbsp;le d\u00e9p\u00f4t d\u2019une r\u00e9clamation en vertu de la [Public Works Act] ne constitue pas une \u201cproc\u00e9dure judiciaire\u201d au sens de ce terme<a href=\"#_ftn13\" id=\"_ftnref13\">[13]<\/a>&nbsp;\u00bb. \u00ab&nbsp;Le processus de traitement d\u2019une r\u00e9clamation en vertu de la <em>Public Works Act<\/em> est de nature administrative, et non judiciaire<a href=\"#_ftn14\" id=\"_ftnref14\">[14]<\/a>.&nbsp;\u00bb<\/p>\n\n\n\n<p>En appel, la Cour du Banc du Roi de l\u2019Alberta a infirm\u00e9 la d\u00e9cision du juge des requ\u00eates, concluant que la demande reconventionnelle satisfaisait \u00e0 chacun des quatre \u00e9l\u00e9ments requis pour \u00e9tablir l\u2019abus de proc\u00e9dure<a href=\"#_ftn15\" id=\"_ftnref15\">[15]<\/a>&nbsp;:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li style=\"margin-bottom:var(--wp--preset--spacing--x-small)\">le d\u00e9fendeur a engag\u00e9 une proc\u00e9dure judiciaire mettant en cause le demandeur;<\/li>\n\n\n\n<li style=\"margin-bottom:var(--wp--preset--spacing--x-small)\">la proc\u00e9dure judiciaire a \u00e9t\u00e9 engag\u00e9e principalement dans le but de favoriser la r\u00e9alisation d\u2019un objectif indirect, accessoire et ill\u00e9gitime;<\/li>\n\n\n\n<li style=\"margin-bottom:var(--wp--preset--spacing--x-small)\">le d\u00e9fendeur a pos\u00e9 un acte pr\u00e9cis ou prof\u00e9r\u00e9 une menace concr\u00e8te en vue de r\u00e9aliser l\u2019objectif ill\u00e9gitime;<\/li>\n\n\n\n<li style=\"margin-bottom:var(--wp--preset--spacing--x-small)\">il en est r\u00e9sult\u00e9 des dommages-int\u00e9r\u00eats sp\u00e9ciaux.<\/li>\n<\/ol>\n\n\n\n<p>Pour d\u00e9terminer s\u2019il y avait lieu de rejeter la demande reconventionnelle pour abus de proc\u00e9dure, le tribunal a statu\u00e9 comme suit&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Premi\u00e8rement, le tribunal a conclu que la demande reconventionnelle \u00ab\u00a0all\u00e9guait express\u00e9ment que l\u2019action civile constituait un abus de proc\u00e9dure, ce qui satisfaisait au premier \u00e9l\u00e9ment constitutif du d\u00e9lit civil<a href=\"#_ftn16\" id=\"_ftnref16\">[16]<\/a>\u00a0\u00bb;<\/li>\n\n\n\n<li>Deuxi\u00e8mement, la demande reconventionnelle \u00ab\u00a0faisait \u00e9tat du but ill\u00e9gitime \u201cde tirer parti des pressions \u00e9conomiques caus\u00e9es par la retenue des paiements progressifs\u201d pour \u201cobtenir l\u2019acceptation des \u2018demandes d\u2019indemnisation\u2019 d\u2019Opabin ou obtenir \u2018d\u2019autres contrats d\u2019approvisionnement<a href=\"#_ftn17\" id=\"_ftnref17\">[17]<\/a>\u2019\u201d\u00a0\u00bb;<\/li>\n\n\n\n<li>Troisi\u00e8mement, un avis de r\u00e9clamation pr\u00e9sent\u00e9 en vertu de la Public Works Act peut constituer \u00ab\u00a0un \u201cacte pr\u00e9cis\u201d ext\u00e9rieur \u00e0 la proc\u00e9dure judiciaire\u00a0\u00bb, question qui devrait \u00eatre tranch\u00e9e sur la foi d\u2019un dossier de preuve complet<a href=\"#_ftn18\" id=\"_ftnref18\">[18]<\/a>;<\/li>\n\n\n\n<li><ins>Q<\/ins>uatri\u00e8mement, \u00ab\u00a0le fait que les dommages sp\u00e9ciaux all\u00e9gu\u00e9s d\u00e9coulaient de la <em>Public Works Act<\/em> et non de l\u2019action civile ne faisait pas obstacle \u00e0 la poursuite de l\u2019action<a href=\"#_ftn19\" id=\"_ftnref19\">[19]<\/a>\u00a0\u00bb.<\/li>\n<\/ul>\n\n\n\n<p>Opabin a ensuite interjet\u00e9 appel de cette d\u00e9cision devant la Cour d\u2019appel de l\u2019Alberta.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La r\u00e9clamation pr\u00e9sent\u00e9e en vertu de la <em>Public Works Act<\/em> ne poursuivait pas un but ill\u00e9gitime.<\/h2>\n\n\n\n<p>La Cour d\u2019appel a conclu que, bien que la Cour du Banc du Roi ait correctement \u00e9nonc\u00e9 le crit\u00e8re juridique applicable au d\u00e9lit civil d\u2019abus de proc\u00e9dure, elle \u00ab&nbsp;avait commis une erreur de droit quant \u00e0 la port\u00e9e de ce d\u00e9lit civil<a href=\"#_ftn20\" id=\"_ftnref20\">[20]<\/a>&nbsp;\u00bb.<\/p>\n\n\n\n<p>Quant au premier \u00e9l\u00e9ment du crit\u00e8re, la Cour a conclu que \u00ab&nbsp;l\u2019abus d\u2019une proc\u00e9dure administrative peut engager la responsabilit\u00e9 de son auteur au titre du d\u00e9lit civil d\u2019abus de proc\u00e9dure<a href=\"#_ftn21\" id=\"_ftnref21\">[21]<\/a>&nbsp;\u00bb. La <em>Public Works Act<\/em> permet aux tribunaux de trancher les r\u00e9clamations contest\u00e9es; par cons\u00e9quent, les proc\u00e9dures administratives \u00ab&nbsp;ne sont [\u2026] pas cloisonn\u00e9es par rapport aux proc\u00e9dures judiciaires, ce qui laisse entendre que leur utilisation abusive peut soulever les m\u00eames pr\u00e9occupations quant \u00e0 la pr\u00e9servation des ressources judiciaires qui sous-tendent [\u2026] le d\u00e9lit civil d\u2019abus de proc\u00e9dure<a href=\"#_ftn22\" id=\"_ftnref22\">[22]<\/a>&nbsp;\u00bb.<\/p>\n\n\n\n<p>Toutefois, en examinant le deuxi\u00e8me \u00e9l\u00e9ment du crit\u00e8re, la Cour a conclu que \u00ab&nbsp;le but ill\u00e9gitime doit constituer le but pr\u00e9dominant de la proc\u00e9dure contest\u00e9e et \u00eatre ext\u00e9rieur \u00e0 celle-ci<a href=\"#_ftn23\" id=\"_ftnref23\">[23]<\/a>&nbsp;\u00bb. Autrement dit, \u00ab&nbsp;la proc\u00e9dure judiciaire doit avoir \u00e9t\u00e9 utilis\u00e9e \u201cpour obtenir un r\u00e9sultat que celle-ci ne permet pas au demandeur d\u2019obtenir<a href=\"#_ftn24\" id=\"_ftnref24\">[24]<\/a>\u201d&nbsp;\u00bb. Le simple fait de faire valoir une action en justice dans le but d\u2019obtenir un r\u00e8glement, ou de chercher \u00e0 contrarier, \u00e0 ruiner ou \u00e0 intimider un d\u00e9fendeur, ne suffit pas \u00e0 \u00e9tablir l\u2019existence d\u2019un \u00ab&nbsp;but abusif<a href=\"#_ftn25\" id=\"_ftnref25\">[25]<\/a>&nbsp;\u00bb.<\/p>\n\n\n\n<p>Bien que la question de savoir si une action a \u00e9t\u00e9 intent\u00e9e dans un \u00ab&nbsp;but ill\u00e9gitime&nbsp;\u00bb doive \u00eatre tranch\u00e9e en fonction des faits propres \u00e0 chaque affaire, il faut que cette action ait \u00e9t\u00e9 intent\u00e9e dans le but d\u2019\u00ab&nbsp;exploiter la loi afin d\u2019obtenir un r\u00e9sultat qui d\u00e9passe les limites qu\u2019elle fixe<a href=\"#_ftn26\" id=\"_ftnref26\">[26]<\/a>&nbsp;\u00bb. Toutefois, dans le pr\u00e9sent cas, la <em>Public Works Act <\/em>pr\u00e9voit express\u00e9ment ce type de r\u00e9clamation, de sorte que \u00ab&nbsp;le but all\u00e9gu\u00e9 de faire pression sur Sarcee afin qu\u2019elle r\u00e8gle le diff\u00e9rend [\u2026] s\u2019inscrit dans le cadre de la r\u00e9clamation pr\u00e9sent\u00e9e en vertu de la <em>Public Works Act<\/em>, plut\u00f4t que d\u2019\u00eatre \u201centi\u00e8rement ext\u00e9rieur\u201d \u00e0 celui-ci<a href=\"#_ftn27\" id=\"_ftnref27\">[27]<\/a>&nbsp;\u00bb.<\/p>\n\n\n\n<p>En outre, bien que le fait de pr\u00e9senter une r\u00e9clamation dans le but \u00ab&nbsp;d\u2019obtenir d\u2019autres contrats d\u2019approvisionnement sans lien avec celle-ci&nbsp;\u00bb puisse constituer un objectif indirect, accessoire et ill\u00e9gitime suffisant pour satisfaire au deuxi\u00e8me \u00e9l\u00e9ment constitutif du d\u00e9lit civil, les faits all\u00e9gu\u00e9s dans la demande reconventionnelle n\u2019\u00e9tayaient pas cette all\u00e9gation<a href=\"#_ftn28\" id=\"_ftnref28\">[28]<\/a>.<\/p>\n\n\n\n<p>La Cour a donc conclu que, \u00ab&nbsp;puisque le but ill\u00e9gitime all\u00e9gu\u00e9 consistant \u00e0 obtenir une indemnisation de Sarcee s\u2019inscrivait dans le cadre de la proc\u00e9dure judiciaire [\u2026], ce but ne constitue pas un objectif indirect, accessoire et ill\u00e9gitime suffisant pour satisfaire au deuxi\u00e8me \u00e9l\u00e9ment constitutif du d\u00e9lit civil<a href=\"#_ftn29\" id=\"_ftnref29\">[29]<\/a>&nbsp;\u00bb.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La r\u00e9clamation pr\u00e9sent\u00e9e en vertu de la <em>Public Works Act<\/em> ne constituait pas un acte pos\u00e9 en vue de r\u00e9aliser un but ill\u00e9gitime<\/h2>\n\n\n\n<p>En examinant le troisi\u00e8me \u00e9l\u00e9ment du crit\u00e8re relatif \u00e0 l\u2019abus de proc\u00e9dure, la Cour a conclu que l\u2019exigence d\u2019\u00ab&nbsp;un acte manifeste ou d\u2019une menace&nbsp;\u00bb vise \u00e0 \u00e9viter que \u00ab&nbsp;toute proc\u00e9dure judiciaire puisse \u00eatre contest\u00e9e en raison de son objectif cach\u00e9<a href=\"#_ftn30\" id=\"_ftnref30\">[30]<\/a>&nbsp;\u00bb. Par cons\u00e9quent, \u00ab&nbsp;l\u2019acte manifeste doit \u00eatre ext\u00e9rieur \u00e0 l\u2019action contest\u00e9e et se situer \u201chors du cadre de celle-ci\u201d, plut\u00f4t que de simplement d\u00e9couler [\u2026] des motifs ill\u00e9gitimes all\u00e9gu\u00e9s<a href=\"#_ftn31\" id=\"_ftnref31\">[31]<\/a>.&nbsp;\u00bb<\/p>\n\n\n\n<p>Dans cette affaire, la Cour a reconnu que l\u2019all\u00e9gation selon laquelle la r\u00e9clamation pr\u00e9sent\u00e9e en vertu de la <em>Public Works Act <\/em>avait \u00e9t\u00e9 d\u00e9pos\u00e9e en vue de r\u00e9aliser un but ill\u00e9gitime constituait une pr\u00e9tention juridique in\u00e9dite, non reconnue en droit<a href=\"#_ftn32\" id=\"_ftnref32\"><ins>[32]<\/ins><\/a>. En outre, bien que l\u2019article 40 de la PPCLA engage la responsabilit\u00e9 de la partie qui enregistre \u00ab&nbsp;des privil\u00e8ges grossi\u00e8rement exag\u00e9r\u00e9s ou des privil\u00e8ges dont elle sait ou devrait savoir qu\u2019ils sont sans fondement&nbsp;\u00bb, la <em>Public Works Act<\/em> ne pr\u00e9voit aucun recours l\u00e9gal de cette nature<a href=\"#_ftn33\" id=\"_ftnref33\">[33]<\/a>.<\/p>\n\n\n\n<p>Ainsi, puisque \u00ab\u00a0le l\u00e9gislateur a choisi de pr\u00e9voir un recours en cas d\u2019utilisation abusive d\u2019un type de m\u00e9canisme d\u2019ex\u00e9cution pr\u00e9alable au jugement, mais non d\u2019un autre\u00a0\u00bb, la Cour a \u00ab\u00a0refus\u00e9 de reconna\u00eetre une cause d\u2019action in\u00e9dite que le l\u00e9gislateur avait choisi de ne pas reconna\u00eetre<a href=\"#_ftn34\" id=\"_ftnref34\">[34]<\/a>\u00a0\u00bb.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Points cl\u00e9s \u00e0 retenir pour les parties dont les paiements sont retenus en vertu de la <em>Public Works Act<\/em><\/h2>\n\n\n\n<p>Alors que la d\u00e9cision de la Cour du Banc du Roi dans Opabin Sand permettait aux entrepreneurs d\u2019intenter des actions en responsabilit\u00e9 d\u00e9lictuelle contre les parties pr\u00e9sentant des r\u00e9clamations irr\u00e9guli\u00e8res en vertu de la Public Works Act, la Cour d\u2019appel a restreint la port\u00e9e de tels recours en common law. En pratique, la d\u00e9cision de la Cour d\u2019appel confirme l\u2019existence de la lacune d\u00e9j\u00e0 pr\u00e9sente dans la <em>Public Works Act<\/em>, de sorte que les paiements dus aux entrepreneurs dans le cadre d\u2019un projet de construction constituant un \u00ab&nbsp;ouvrage public&nbsp;\u00bb peuvent continuer d\u2019\u00eatre retenus en raison de r\u00e9clamations irr\u00e9guli\u00e8res pr\u00e9sent\u00e9es en vertu de la Loi, sauf dans des circonstances limit\u00e9es.<\/p>\n\n\n\n<p>Bien que les effets de la d\u00e9cision de la Cour dans Opabin Sand restent \u00e0 d\u00e9terminer, les parties \u00e0 des projets de construction devraient \u00eatre conscientes de leur droit \u00e9ventuel \u00e0 des recours en common law lorsque des paiements ont \u00e9t\u00e9 retenus en vertu de la Public Works Act. Si vous avez besoin d\u2019aide pour g\u00e9rer des r\u00e9clamations pr\u00e9sent\u00e9es en vertu de la Public Works Act, les avocats du groupe <ins><a href=\"https:\/\/www.millerthomson.com\/fr\/secteurs\/construction-et-infrastructures\/\">Construction et infrastructures<\/a><\/ins> de Miller Thomson sont \u00e0 votre disposition pour vous aider \u00e0 obtenir des recours efficaces et \u00e0 vous fournir des conseils pratiques.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><a href=\"#_ftnref1\" id=\"_ftn1\">[1]<\/a> RSA 2000, c P-46 [<em>Public Works Act<\/em>].<\/p>\n\n\n\n<p><a href=\"#_ftnref2\" id=\"_ftn2\">[2]<\/a> 2025 ABKB 623 [<em>Opabin Sand #1<\/em>].<\/p>\n\n\n\n<p><a href=\"#_ftnref3\" id=\"_ftn3\">[3]<\/a> Alta Reg 124\/2010 [<em>R\u00e8gles de proc\u00e9dure de l\u2019Alberta<\/em>].<\/p>\n\n\n\n<p><a href=\"#_ftnref4\" id=\"_ftn4\">[4]<\/a> 2026 ABCA 212 [<em>Opabin Sand #2<\/em>].<\/p>\n\n\n\n<p><a href=\"#_ftnref5\" id=\"_ftn5\">[5]<\/a> <em>Ibid <\/em>au par. 4.<\/p>\n\n\n\n<p><a href=\"#_ftnref6\" id=\"_ftn6\">[6]<\/a> <em>Public Works Act, pr\u00e9cit\u00e9e, note 1, art. 1g).<\/em><\/p>\n\n\n\n<p><a href=\"#_ftnref7\" id=\"_ftn7\">[7]<\/a> <em>Opabin Sand #2, pr\u00e9cit\u00e9e, <\/em>note 4 au par. 2.<\/p>\n\n\n\n<p><a href=\"#_ftnref8\" id=\"_ftn8\">[8]<\/a> <em>Ibid<\/em> au par. 2.<\/p>\n\n\n\n<p><a href=\"#_ftnref9\" id=\"_ftn9\">[9]<\/a> <em>Ibid<\/em> au par. 3.<\/p>\n\n\n\n<p><a href=\"#_ftnref10\" id=\"_ftn10\">[10]<\/a> <em>Ibid<\/em> au par. 4; <em>Public Works Act, pr\u00e9cit\u00e9e, <\/em>note 1, art.14(1)<\/p>\n\n\n\n<p><a href=\"#_ftnref11\" id=\"_ftn11\">[11]<\/a> <em>Opabin Sand #2, ibid<\/em> au par. 6.<\/p>\n\n\n\n<p><a href=\"#_ftnref12\" id=\"_ftn12\">[12]<\/a> <em>Ibid.<\/em><\/p>\n\n\n\n<p><a href=\"#_ftnref13\" id=\"_ftn13\">[13]<\/a> <em>Ibid <\/em>au par. 12.<\/p>\n\n\n\n<p><a href=\"#_ftnref14\" id=\"_ftn14\">[14]<\/a> <em>Ibid<\/em>.<\/p>\n\n\n\n<p><a href=\"#_ftnref15\" id=\"_ftn15\">[15]<\/a> <em>Ibid <\/em>aux par. 13, 19.<\/p>\n\n\n\n<p><a href=\"#_ftnref16\" id=\"_ftn16\">[16]<\/a> <em>Ibid <\/em>au par. 14, citant <em>Opabin Sand #1, pr\u00e9cit\u00e9e <\/em>\u00e0 lanote 2 au par. 63.<\/p>\n\n\n\n<p><a href=\"#_ftnref17\" id=\"_ftn17\">[17]<\/a> <em>Ibid <\/em>au par. 15, citant <em>Opabin Sand #1, pr\u00e9cit\u00e9e \u00e0 la <\/em>note 2 au par. 64.<\/p>\n\n\n\n<p><a href=\"#_ftnref18\" id=\"_ftn18\">[18]<\/a> <em>Ibid <\/em>au par. 17, citant <em>Opabin Sand #1, pr\u00e9cit\u00e9e \u00e0 la <\/em>note 2 au par. 67.<\/p>\n\n\n\n<p><a href=\"#_ftnref19\" id=\"_ftn19\">[19]<\/a> <em>Ibid <\/em>au par. 18, citant <em>Opabin Sand #1, pr\u00e9cit\u00e9e \u00e0 la <\/em>note 2 aux par. 69-70.<\/p>\n\n\n\n<p><a href=\"#_ftnref20\" id=\"_ftn20\">[20]<\/a> <em>Ibid <\/em>aux par. 20-21.<\/p>\n\n\n\n<p><a href=\"#_ftnref21\" id=\"_ftn21\">[21]<\/a> <em>Ibid <\/em>au par. 25, citant <em>Grenon c. Agence du Revenu du Canada<\/em>, 2<del>\u2009<\/del>017 ABCA 96.<\/p>\n\n\n\n<p><a href=\"#_ftnref22\" id=\"_ftn22\">[22]<\/a> <em>Ibid <\/em>au par. 26.<\/p>\n\n\n\n<p><a href=\"#_ftnref23\" id=\"_ftn23\">[23]<\/a> <em>Ibid <\/em>au par. 30.<\/p>\n\n\n\n<p><a href=\"#_ftnref24\" id=\"_ftn24\">[24]<\/a> <em>Ibid<\/em>.<\/p>\n\n\n\n<p><a href=\"#_ftnref25\" id=\"_ftn25\">[25]<\/a> <em>Ibid <\/em>au par. 31.<\/p>\n\n\n\n<p><a href=\"#_ftnref26\" id=\"_ftn26\">[26]<\/a> <em>Ibid <\/em>au par. 33.<\/p>\n\n\n\n<p><a href=\"#_ftnref27\" id=\"_ftn27\">[27]<\/a> <em>Ibid <\/em>au par. 38.<\/p>\n\n\n\n<p><a href=\"#_ftnref28\" id=\"_ftn28\">[28]<\/a> <em>Ibid <\/em>au par. 47.<\/p>\n\n\n\n<p><a href=\"#_ftnref29\" id=\"_ftn29\">[29]<\/a> <em>Ibid <\/em>au par. 41.<\/p>\n\n\n\n<p><a href=\"#_ftnref30\" id=\"_ftn30\">[30]<\/a> <em>Ibid., au par. 50, citant Sappideen et al., Fleming\u2019s The Law of Torts, 11e \u00e9d. (Pyrmont, N.-G.S.&nbsp;: Thomson Reuters [Professional] Australia Limited: Lawbook Co, 2024), \u00e0 la p. 816.<\/em><\/p>\n\n\n\n<p><a href=\"#_ftnref31\" id=\"_ftn31\">[31]<\/a> <em>Ibid<\/em>.<\/p>\n\n\n\n<p><a href=\"#_ftnref32\" id=\"_ftn32\"><ins>[32]<\/ins><\/a><ins> <\/ins><em><ins>I<\/ins><\/em><em><ins>bid au par. 57.<\/ins><\/em><\/p>\n\n\n\n<p><a href=\"#_ftnref33\" id=\"_ftn33\">[33]<\/a> <em>Ibid <\/em>au par. 58.<\/p>\n\n\n\n<p><a href=\"#_ftnref34\" id=\"_ftn34\">[34]<\/a> <em>Ibid.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les entrepreneurs albertains qui ex\u00e9cutent des travaux dans le cadre de projets de construction constituant des \u00ab&nbsp;travaux publics&nbsp;\u00bb au sens de la Public Works Act (la \u00ab&nbsp;Loi[1]&nbsp;\u00bb) se heurtent souvent \u00e0 des difficult\u00e9s. Plus particuli\u00e8rement, bien que la Loi \u00e9tablisse un processus de r\u00e9clamation, elle ne fixe aucun d\u00e9lai l\u00e9gal pour saisir le tribunal d\u2019une [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":14342,"parent":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[592],"insight-format":[470],"class_list":["post-53514","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bulletin-droit-de-la-construction-et-fr"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs | Miller Thomson<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs | Miller Thomson\" \/>\n<meta property=\"og:description\" content=\"Les entrepreneurs albertains qui ex\u00e9cutent des travaux dans le cadre de projets de construction constituant des \u00ab&nbsp;travaux publics&nbsp;\u00bb au sens de la Public Works Act (la \u00ab&nbsp;Loi[1]&nbsp;\u00bb) se heurtent souvent \u00e0 des difficult\u00e9s. Plus particuli\u00e8rement, bien que la Loi \u00e9tablisse un processus de r\u00e9clamation, elle ne fixe aucun d\u00e9lai l\u00e9gal pour saisir le tribunal d\u2019une [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/\" \/>\n<meta property=\"og:site_name\" content=\"Miller Thomson\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MillerThomsonLaw\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-06T17:52:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-06T17:52:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"994\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katherine Chan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@millerthomson\" \/>\n<meta name=\"twitter:site\" content=\"@millerthomson\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katherine Chan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/\"},\"author\":{\"name\":\"Katherine Chan\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#\\\/schema\\\/person\\\/5473b50a564d1e37f327fdd79cb348f6\"},\"headline\":\"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs\",\"datePublished\":\"2026-08-06T17:52:33+00:00\",\"dateModified\":\"2026-08-06T17:52:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/\"},\"wordCount\":2688,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.millerthomson.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"articleSection\":[\"Bulletin droit de la construction et infrastructures\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"ItemPage\"],\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/\",\"url\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/\",\"name\":\"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs | Miller Thomson\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.millerthomson.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"datePublished\":\"2026-08-06T17:52:33+00:00\",\"dateModified\":\"2026-08-06T17:52:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.millerthomson.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"contentUrl\":\"https:\\\/\\\/www.millerthomson.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"width\":1776,\"height\":994,\"caption\":\"three people wearing hardhats standing at a construction site\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/perspectives-juridiques\\\/bulletin-droit-de-la-construction-et-fr\\\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/\",\"name\":\"Miller Thomson | Cabinet de droit des affaires pancanadien\",\"description\":\"National law firm providing business law expertise and litigation and disputes services for businesses across Canada since 1957.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#organization\",\"name\":\"Miller Thomson | Cabinet de droit des affaires pancanadien\",\"url\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.millerthomson.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/miller-thomson.svg\",\"contentUrl\":\"https:\\\/\\\/www.millerthomson.com\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/miller-thomson.svg\",\"width\":380,\"height\":50,\"caption\":\"Miller Thomson | Cabinet de droit des affaires pancanadien\"},\"image\":{\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/MillerThomsonLaw\\\/\",\"https:\\\/\\\/x.com\\\/millerthomson\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/miller-thomson-llp\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@millerthomson\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.millerthomson.com\\\/fr\\\/#\\\/schema\\\/person\\\/5473b50a564d1e37f327fdd79cb348f6\",\"name\":\"Katherine Chan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g\",\"caption\":\"Katherine Chan\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs | Miller Thomson","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/","og_locale":"fr_FR","og_type":"article","og_title":"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs | Miller Thomson","og_description":"Les entrepreneurs albertains qui ex\u00e9cutent des travaux dans le cadre de projets de construction constituant des \u00ab&nbsp;travaux publics&nbsp;\u00bb au sens de la Public Works Act (la \u00ab&nbsp;Loi[1]&nbsp;\u00bb) se heurtent souvent \u00e0 des difficult\u00e9s. Plus particuli\u00e8rement, bien que la Loi \u00e9tablisse un processus de r\u00e9clamation, elle ne fixe aucun d\u00e9lai l\u00e9gal pour saisir le tribunal d\u2019une [&hellip;]","og_url":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/","og_site_name":"Miller Thomson","article_publisher":"https:\/\/www.facebook.com\/MillerThomsonLaw\/","article_published_time":"2026-08-06T17:52:33+00:00","article_modified_time":"2026-08-06T17:52:38+00:00","og_image":[{"width":1776,"height":994,"url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","type":"image\/jpeg"}],"author":"Katherine Chan","twitter_card":"summary_large_image","twitter_creator":"@millerthomson","twitter_site":"@millerthomson","twitter_misc":{"Written by":"Katherine Chan","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#article","isPartOf":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/"},"author":{"name":"Katherine Chan","@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/5473b50a564d1e37f327fdd79cb348f6"},"headline":"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs","datePublished":"2026-08-06T17:52:33+00:00","dateModified":"2026-08-06T17:52:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/"},"wordCount":2688,"commentCount":0,"publisher":{"@id":"https:\/\/www.millerthomson.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#primaryimage"},"thumbnailUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","articleSection":["Bulletin droit de la construction et infrastructures"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#respond"]}]},{"@type":["WebPage","ItemPage"],"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/","url":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/","name":"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs | Miller Thomson","isPartOf":{"@id":"https:\/\/www.millerthomson.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#primaryimage"},"image":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#primaryimage"},"thumbnailUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","datePublished":"2026-08-06T17:52:33+00:00","dateModified":"2026-08-06T17:52:38+00:00","breadcrumb":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#primaryimage","url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","contentUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","width":1776,"height":994,"caption":"three people wearing hardhats standing at a construction site"},{"@type":"BreadcrumbList","@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/reclamations-injustifiees-en-vertu-de-la-public-works-act-de-lalberta-mise-a-jour-sur-les-recours-de-common-law-dont-disposent-les-entrepreneurs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.millerthomson.com\/fr\/"},{"@type":"ListItem","position":2,"name":"R\u00e9clamations injustifi\u00e9es en vertu de la Public Works Act de l\u2019Alberta&nbsp;: mise \u00e0 jour sur les recours de common law dont disposent les entrepreneurs"}]},{"@type":"WebSite","@id":"https:\/\/www.millerthomson.com\/fr\/#website","url":"https:\/\/www.millerthomson.com\/fr\/","name":"Miller Thomson | Cabinet de droit des affaires pancanadien","description":"National law firm providing business law expertise and litigation and disputes services for businesses across Canada since 1957.","publisher":{"@id":"https:\/\/www.millerthomson.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.millerthomson.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.millerthomson.com\/fr\/#organization","name":"Miller Thomson | Cabinet de droit des affaires pancanadien","url":"https:\/\/www.millerthomson.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg","contentUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg","width":380,"height":50,"caption":"Miller Thomson | Cabinet de droit des affaires pancanadien"},"image":{"@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/MillerThomsonLaw\/","https:\/\/x.com\/millerthomson","https:\/\/www.linkedin.com\/company\/miller-thomson-llp\/","https:\/\/www.youtube.com\/@millerthomson"]},{"@type":"Person","@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/5473b50a564d1e37f327fdd79cb348f6","name":"Katherine Chan","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g","caption":"Katherine Chan"}}]}},"_links":{"self":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/posts\/53514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/comments?post=53514"}],"version-history":[{"count":5,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/posts\/53514\/revisions"}],"predecessor-version":[{"id":53734,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/posts\/53514\/revisions\/53734"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/media\/14342"}],"wp:attachment":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/media?parent=53514"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/categories?post=53514"},{"taxonomy":"insight-format","embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/insight-format?post=53514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}