{"id":40715,"date":"2025-09-10T14:41:54","date_gmt":"2025-09-10T18:41:54","guid":{"rendered":"https:\/\/www.millerthomson.com\/?p=40715"},"modified":"2025-11-25T12:27:33","modified_gmt":"2025-11-25T17:27:33","slug":"privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale","status":"publish","type":"post","link":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/","title":{"rendered":"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada?"},"content":{"rendered":"\n<p>Les retards de paiement figurent parmi les risques qui p\u00e8sent le plus lourdement sur les projets de constructions, allant m\u00eame jusqu\u2019\u00e0 causer des probl\u00e8mes de flux de tr\u00e9sorerie susceptibles de bouleverser les calendriers et de mettre \u00e0 mal les relations.<\/p>\n\n\n\n<p>Pour rem\u00e9dier \u00e0 la situation, de nombreuses provinces canadiennes ont adopt\u00e9 \u2013 ou entrepris d\u2019adopter \u2013 une loi sur le paiement rapide destin\u00e9e \u00e0 bonifier les lois existantes sur les privil\u00e8ges de construction.<\/p>\n\n\n\n<p>Ces nouveaux r\u00e9gimes l\u00e9gislatifs obligent les entrepreneurs \u00e0 transmettre des \u00ab&nbsp;factures en bonne et due forme&nbsp;\u00bb dans des d\u00e9lais stricts et \u00e0 permettre l\u2019acc\u00e8s \u00e0 l\u2019arbitrage int\u00e9rimaire en cas de diff\u00e9rend. L\u2019objectif est simple&nbsp;: favoriser la circulation de l\u2019argent dans la pyramide de construction et \u00e9viter les retards co\u00fbteux dans les projets.<\/p>\n\n\n\n<p>Alors que les provinces continuent de mettre en \u0153uvre ces cadres l\u00e9gislatifs, le pr\u00e9sent article met en lumi\u00e8re les tout derniers d\u00e9veloppements qui se sont op\u00e9r\u00e9s \u00e0 l\u2019\u00e9chelle nationale pour vous permettre de pr\u00e9voir les changements, prot\u00e9ger vos r\u00e9sultats et demeurer bien en selle dans un contexte juridique en pleine \u00e9volution.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><a><\/a>O\u00f9 en sommes-nous? La situation de la l\u00e9gislation sur le paiement rapide au Canada<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">L\u2019Ontario m\u00e8ne le bal<\/h3>\n\n\n\n<p>L\u2019Ontario a \u00e9t\u00e9 la premi\u00e8re province canadienne \u00e0 adopter un r\u00e9gime de paiement rapide et d\u2019arbitrage int\u00e9rimaire en apportant des modifications \u00e0 sa <a href=\"https:\/\/www.canlii.org\/fr\/on\/legis\/lois\/lro-1990-c-c30\/derniere\/lro-1990-c-c30.html\"><em>Loi sur la construction<\/em><\/a>.Ce r\u00e9gime, en vigueur depuis le 1<sup>er<\/sup>&nbsp;octobre&nbsp;2019, s\u2019applique \u00e0 tous les contrats et contrats de sous-traitance de construction r\u00e9gis par la loi de l\u2019Ontario, et a modifi\u00e9 la dynamique du paiement en introduisant des d\u00e9lais stricts et un processus de r\u00e9solution acc\u00e9l\u00e9r\u00e9e des diff\u00e9rends.<\/p>\n\n\n\n<p>La <em>Loi sur la construction <\/em>d\u00e9finit ce qu\u2019est une \u00ab\u00a0facture en bonne et due forme\u00a0\u00bb, que l\u2019entrepreneur est tenu de fournir mensuellement au propri\u00e9taire (sous r\u00e9serve du contrat conclu par les parties) et \u00e9tablit des d\u00e9lais de paiement stricts. Les diff\u00e9rends relatifs aux paiements peuvent \u00eatre soumis \u00e0 un processus d\u2019arbitrage afin d\u2019assurer le r\u00e8glement efficace des questions en cause. La <em>Loi sur la construction <\/em>a de nouveau \u00e9t\u00e9 modifi\u00e9e en novembre\u00a02024, bien que ces modifications n\u2019aient pas encore \u00e9t\u00e9 adopt\u00e9es<a id=\"_ftnref1\" href=\"#_ftn1\">[1]<\/a>.<\/p>\n\n\n\n<p>Depuis l\u2019entr\u00e9e en vigueur de la <em>Loi sur la construction<\/em>, les avocats de Miller Thomson surveillent de pr\u00e8s et analysent son application par les tribunaux et arbitres de l\u2019Ontario, notamment dans les publications suivantes&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=10829\">(En anglais) The <em>Construction Act<\/em>: Prompt Payment and the Concept of Proper Invoice \u2013 Getting Organized<\/a> (2&nbsp;avril&nbsp;2019);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11786\">(En anglais) Divisional Court\u2019s strict enforcement of the prompt payment and adjudication regimes under the <em>Construction Act<\/em> (Ontario)<\/a>(4&nbsp;octobre&nbsp;2022);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11819\">(En anglais) Ontario\u2019s construction dispute interim adjudication: Pros and cons<\/a> (3&nbsp;novembre&nbsp;2022);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=12072\">(En anglais) Ontario Court rejects motion filed under section 47 of the Construction Act; clarifies the concept of \u201cabandonment of contract\u201d in construction lien matter<\/a> (6&nbsp;octobre&nbsp;2023);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/implementation-prompt-payment-statutory-adjudication-regime-ontario\/\">Rapport annuel\u00a02023 de l\u2019ODACC\u00a0: constats sur le r\u00e9gime de paiements rapides et d\u2019arbitrage en Ontario<\/a>\u00a0 (25\u00a0janvier\u00a02024);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/gatekeeper-function-preserving-construction-lien\/\">Le r\u00f4le de gardien dans la pr\u00e9servation du privil\u00e8ge de construction<\/a> (30\u00a0avril\u00a02024);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/la-cour-superieure-de-justice-donne-des-precisions-sur-les-decisions-darbitres-et-sur-la-remise-ou-la-reduction-du-montant-de-la-caution-en-lien-avec-le-privilege-du-constructeur\/\" target=\"_blank\" rel=\"noreferrer noopener\">La Cour sup\u00e9rieure de justice donne des pr\u00e9cisions sur les d\u00e9cisions d\u2019arbitres et sur la remise ou la r\u00e9duction du montant de la caution en lien avec le privil\u00e8ge du constructeur<\/a>\u00a0 (27\u00a0juin\u00a02024); et<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/entrepreneurs-produisez-vous-des-factures-en-bonne-et-due-forme-pour-les-services-de-construction-et-les-materiaux-se-rapportant-a-une-amelioration-lecons-de-laffair\/\">Entrepreneurs, produisez-vous des factures \u00ab\u00a0en bonne et due forme\u00a0\u00bb pour les services de construction et les mat\u00e9riaux se rapportant \u00e0 une am\u00e9lioration? <\/a>Le\u00e7ons de l\u2019affaire Arcamm v. Avision\u00a0 (31\u00a0octobre\u00a02024).<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Paiement rapide&nbsp;: nouveau r\u00e9gime en place en Saskatchewan<\/h3>\n\n\n\n<p>La Saskatchewan a embo\u00eet\u00e9 le pas \u00e0 l\u2019Ontario en adoptant la <a href=\"https:\/\/www.canlii.org\/en\/sk\/laws\/astat\/ss-2019-c-2\/latest\/ss-2019-c-2.html?resultId=ffbe496a37b14f4ababb3cf742daa3fb&amp;searchId=2025-09-02T15:20:38:290\/a223a3ebf7634b31824fcc34cdaa7ca5\"><em>The Builders\u2019 Lien (Prompt Payment) Amendment Act, 2019<\/em><\/a>, qui est entr\u00e9e en vigueur le 1<sup>er<\/sup>&nbsp;mars&nbsp;2022<a href=\"#_ftn2\" id=\"_ftnref2\">[2]<\/a>. Les nouveaux changements applicables au paiement rapide et \u00e0 l\u2019arbitrage int\u00e9rimaire s\u2019appliquent aux contrats conclus apr\u00e8s cette date. Les contrats ant\u00e9rieurs demeurent cependant r\u00e9gis par l\u2019ancienne <em>Builders\u2019 Lien Act<\/em><a href=\"#_ftn3\" id=\"_ftnref3\">[3]<\/a>. La <em>The Builders\u2019 Lien (Prompt Payment) Admendment Act, 2019<\/em> \u00e9tablit un organisme et un processus d\u2019arbitrage pour la r\u00e9solution des diff\u00e9rends relatifs aux paiements entre propri\u00e9taires, entrepreneurs et sous-traitants.<\/p>\n\n\n\n<p>Notre \u00e9quipe a analys\u00e9 les r\u00e9percussions qu\u2019ont ces changements sur les pratiques de paiement dans le secteur de la construction en Saskatchewan&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11585\">(En anglais) Please pay ASAP \u2013 Saskatchewan\u2019s prompt payment legislation will be in force in March 2022<\/a> (2&nbsp;novembre&nbsp;2021).<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">R\u00e9gime de l\u2019Alberta&nbsp;: principaux points et dates \u00e0 retenir<\/h3>\n\n\n\n<p>En Alberta, la <a href=\"https:\/\/www.canlii.org\/en\/ab\/laws\/stat\/rsa-2000-c-p-26.4\/latest\/rsa-2000-c-p-26.4.html?resultId=fa8338fe98d549fcb9e8b74b72c72401&amp;searchId=2025-09-02T14:29:09:571\/57f3575123e249a584f7abd83a463e5d\"><em>Prompt Payment and Construction Lien Act<\/em><\/a><em> <\/em>(la \u00ab&nbsp;<strong><em>PPCLA&nbsp;<\/em><\/strong><em>\u00bb<\/em>), qui a re\u00e7u la sanction royale le 1<sup>er<\/sup>&nbsp;avril&nbsp;2025, remplace la <em>Builders\u2019 Lien Act <\/em>etintroduit le concept de paiement rapide ainsi que les processus d\u2019arbitrage dans le paysage de la construction de l\u2019Alberta<a href=\"#_ftn4\" id=\"_ftnref4\">[4]<\/a>. Le r\u00e9gime de paiement rapide d\u00e9finit ce qu\u2019est une \u00ab&nbsp;proper invoice&nbsp;\u00bb (facture en bonne et due forme) et fixe des d\u00e9lais stricts pour sa transmission.<\/p>\n\n\n\n<p>Il est possible de recourir \u00e0 l\u2019arbitrage aussi bien apr\u00e8s l\u2019ach\u00e8vement d\u2019un projet qu\u2019apr\u00e8s le d\u00e9but d\u2019une proc\u00e9dure d\u2019arbitrage ou d\u2019une action en justice. De plus, l\u2019ordonnance de l\u2019arbitre peut \u00eatre enregistr\u00e9e aupr\u00e8s du tribunal, m\u00eame lorsqu\u2019une requ\u00eate en r\u00e9vision judiciaire a \u00e9t\u00e9 pr\u00e9sent\u00e9e.<\/p>\n\n\n\n<p>D\u2019autres modifications apport\u00e9es \u00e0 la <em>PPCLA<\/em> ont \u00e9t\u00e9 adopt\u00e9es le 1<sup>er<\/sup>&nbsp;avril&nbsp;2025. Ces modifications ont modifi\u00e9 le processus d\u2019arbitrage et \u00e9tendu des parties du r\u00e9gime aux projets provinciaux<a href=\"#_ftn5\" id=\"_ftnref5\">[5]<\/a>.<\/p>\n\n\n\n<p>Les avocats en droit de la construction de Miller Thomson ont surveill\u00e9 l\u2019\u00e9volution de la <em>PPCLA<\/em> et formul\u00e9 des commentaires sur la jurisprudence entourant cette nouvelle loi&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11320\">(En anglais) Prompt payments and adjudication are set to arrive in Alberta\u2019s construction industry<\/a> (17&nbsp;novembre&nbsp;2020);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11344\">(En anglais) Bill 37: <em>Builders\u2019 Lien (Prompt Payment) Amendment Act, 2020 <\/em>passed its third reading in the legislative assembly of Alberta<\/a> (15&nbsp;d\u00e9cembre&nbsp;2020);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11449\">(En anglais) Updates to Bill 37: <em>Builders\u2019 Lien (Prompt Payment) Amendment Act, 2020<\/em><\/a> (22&nbsp;avril&nbsp;2021);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11502\">(En anglais) Prompt payment update<\/a> (17&nbsp;juin&nbsp;2021);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11615\">(En anglais) Potential Timelines for implementation of Bill 37, the <em>Builders\u2019 Lien (Prompt Payment) Amendment Act<\/em>, 2020<\/a> (6&nbsp;janvier&nbsp;2022);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11650\">(En anglais) Bill 37: Prompt Payment slated to come into force on August 29, 2022<\/a><strong><u> (and Regulations!)<\/u><\/strong> (2&nbsp;mars&nbsp;2022);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11749\">(En anglais) What to expect as the implementation of prompt payment in Alberta looms: The Final countdown<\/a> (18&nbsp;ao\u00fbt&nbsp;2022);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11775\">(En anglais) Alberta\u2019s new prompt payment and construction lien legislation: An overview<\/a> (27&nbsp;septembre&nbsp;2022);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?p=11960\">(En anglais) <em>CCS Contracting Ltd. v Condominium Corporation No. 1520090 <\/em>and certificates of Lis Pendens under the Prompt Payment and Construction Lien Act<\/a> (9&nbsp;mai&nbsp;2023);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/?post_type=events&amp;p=7990\">(En anglais) A Year Later: Update on the Implementation of the Prompt Payment and Construction Lien Act (the \u201cPPCA\u201d)<\/a> (7&nbsp;novembre&nbsp;2023);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/les-decisions-darbitrage-en-construction-en-alberta-executoires-et-sans-appel-interpretation-judiciaire-de-la-partie-5-de-la-prompt-payment-and-construction-lien-act\/\">Les d\u00e9cisions d\u2019arbitrage en construction en Alberta, ex\u00e9cutoires et sans appel? <\/a>Interpr\u00e9tation judiciaire de la partie\u00a05 de la Prompt Payment and Construction Lien Act\u00a0 (31\u00a0juillet\u00a02024);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/delai-pour-le-depot-dune-action-relative-aux-privileges-ordonnances-sur-consentement-et-affaire-lesenko-v-wild-rose-ready-mix-ltd-2024-abkb-333\/\">(En anglais) Timeliness of lien litigation, consent orders and <em>Lesenko v Wild Rose Ready Mix Ltd<\/em><\/a> (31\u00a0juillet\u00a02024);<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/delai-pour-le-depot-dune-action-relative-aux-privileges-ordonnances-sur-consentement-et-affaire-lesenko-v-wild-rose-ready-mix-ltd-2024-abkb-333\/\">(En anglais)<\/a><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/la-prompt-payment-and-construction-lien-act-deux-ans-plus-tard\/\">The Prompt Payment and Construction Lien Act<strong>, deux ans plus tard<\/strong><\/a> (1<sup>er<\/sup>\u00a0octobre\u00a02024)<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/en\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/bill-30-major-changes-to-albertas-prompt-payment-public-works-legislation\/\">Projet de loi&nbsp;30&nbsp;: modifications importantes \u00e0 la <em>Prompt Payment and Construction Lien Act de l\u2019Alberta<\/em><\/a><a href=\"#_msocom_10\">[s10]<\/a>&nbsp; (11&nbsp;d\u00e9cembre&nbsp;2024); et<\/li>\n\n\n\n<li><a href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/modifications-apportees-aux-lois-de-lalberta-concernant-le-paiement-rapide-et-les-travaux-publics-en-vigueur-le-1er-avril-2025\/\">Modifications apport\u00e9es aux lois de l\u2019Alberta concernant le paiement rapide et les travaux publics en vigueur le 1<sup>er\u00a0<\/sup>avril\u00a0<strong>2025<\/strong><\/a>\u00a0(3\u00a0avril\u00a02025<em>)<\/em><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Nouvelle-\u00c9cosse, Manitoba, Nouveau-Brunswick et T.N.-O.&nbsp;: o\u00f9 en sont ces provinces en mati\u00e8re de paiement rapide?<\/h3>\n\n\n\n<p>D\u2019autres provinces n\u2019ont pas tard\u00e9 non plus \u00e0 mettre en place un r\u00e9gime similaire dans leur territoire de comp\u00e9tence respectif.<\/p>\n\n\n\n<p>En Nouvelle-\u00c9cosse, la <em><u>Builders\u2019 Lien Act<\/u><\/em><a href=\"https:\/\/www.canlii.org\/en\/ns\/laws\/stat\/rsns-1989-c-277\/latest\/rsns-1989-c-277.html?resultId=0d84ad5234024e63a2353d286bd8abf4&amp;searchId=2025-09-02T15:21:47:432\/62a6a3b12a2c4e92afd0edd98286c6ec\"><\/a><em> (modifi\u00e9e)<\/em> a re\u00e7u la sanction royale le 12&nbsp;avril&nbsp;2019<a href=\"#_ftn6\" id=\"_ftnref6\">[6]<\/a>. La version modifi\u00e9e de la loi pr\u00e9voit qu\u2019un diff\u00e9rend ne peut \u00eatre soumis \u00e0 l\u2019arbitrage que s\u2019il concerne le paiement pr\u00e9vu dans un contrat, l\u2019\u00e9valuation des services ou des mat\u00e9riaux pr\u00e9vus dans un contrat, ou une question prescrite<a href=\"#_ftn7\" id=\"_ftnref7\">[7]<\/a>. Cependant, la <em>Builders\u2019 Lien Act (modifi\u00e9e)<\/em> n\u2019est pas encore entr\u00e9e en vigueur, car le gouvernement provincial n\u2019a pas termin\u00e9 d\u2019\u00e9laborer le r\u00e8glement d\u2019application des modifications<a href=\"#_ftn8\" id=\"_ftnref8\">[8]<\/a>. Apr\u00e8s son entr\u00e9e en vigueur, la loi sur les privil\u00e8ges sera renomm\u00e9e <em>Builders Lien and Prompt Payment Act<\/em>.<\/p>\n\n\n\n<p>Au Manitoba, la <em>Builders\u2019 Liens Amendment Act (Prompt Payment) <\/em>a re\u00e7u la sanction royale le 30&nbsp;mai&nbsp;2023 et est entr\u00e9e en vigueur le 1<sup>er<\/sup>&nbsp;avril&nbsp;2025<a href=\"#_ftn9\" id=\"_ftnref9\">[9]<\/a>. Cette loi modifie la <a href=\"https:\/\/www.canlii.org\/en\/mb\/laws\/astat\/sm-2023-c-30\/latest\/sm-2023-c-30.html?resultId=e1120e866c4a497b8c7eb77827646e3c&amp;searchId=2025-09-02T15:22:33:108\/a3825723998c491dac7acfae07559e56\"><em>Builders\u2019 Liens Act<\/em><\/a><em> <\/em>de la province et fixe les d\u00e9lais dans lesquels les \u00ab&nbsp;proper invoices&nbsp;\u00bb (factures en bonne et due forme) doivent \u00eatre transmises et pay\u00e9es par les parties au projet de construction, et pr\u00e9voit les types de diff\u00e9rends qui peuvent \u00eatre soumis \u00e0 l\u2019arbitrage<a href=\"#_ftn10\" id=\"_ftnref10\">[10]<\/a>.<\/p>\n\n\n\n<p>Au Nouveau-Brunswick, la <a href=\"https:\/\/www.canlii.org\/fr\/nb\/legis\/lois\/ln-b-2023-c-15\/derniere\/ln-b-2023-c-15.html\"><em>Loi sur les paiements rapides et les r\u00e8glements des diff\u00e9rends dans le secteur de la construction<\/em><\/a> a re\u00e7u la sanction royale le 16&nbsp;juin&nbsp;2023, mais n\u2019est pas encore entr\u00e9e en vigueur<a href=\"#_ftn11\" id=\"_ftnref11\">[11]<\/a>. En vertu de cette loi, les parties peuvent soumettre \u00e0 l\u2019arbitrage un diff\u00e9rend relatif au paiement, \u00e0 condition que la partie qui donne l\u2019avis d\u2019arbitrage le fasse avant la date d\u2019ex\u00e9cution du contrat<a href=\"#_ftn12\" id=\"_ftnref12\">[12]<\/a>.<\/p>\n\n\n\n<p>Enfin, dans les Territoires du Nord-Ouest, la <a href=\"https:\/\/www.canlii.org\/fr\/nt\/legis\/loisa\/ltno-2023-c-24\/derniere\/ltno-2023-c-24.html\"><em>Loi sur les privil\u00e8ges de construction<\/em><\/a><em> <\/em>a re\u00e7u la sanction royale le 6&nbsp;octobre&nbsp;2023 et est entr\u00e9e en vigueur le 1<sup>er<\/sup>&nbsp;septembre&nbsp;2025; elle contient des dispositions relatives au paiement rapide visant \u00e0 faire en sorte que les entrepreneurs soient pay\u00e9s sans tarder<a href=\"#_ftn13\" id=\"_ftnref13\">[13]<\/a>. Cependant, la <em><u>Loi sur les privil\u00e8ges de construction<\/u><\/em> ne pr\u00e9voit pas d\u2019arbitrage en cas de diff\u00e9rend relatif au paiement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">La suite&nbsp;: plans des provinces concernant la l\u00e9gislation future sur le paiement rapide<\/h2>\n\n\n\n<p>D\u2019autres provinces ont choisi de continuer d\u2019appliquer leurs lois existantes sur les privil\u00e8ges de construction ou viennent juste d\u2019entreprendre les d\u00e9marches n\u00e9cessaires pour mettre en \u0153uvre un r\u00e9gime de paiement rapide similaire \u00e0 ceux adopt\u00e9s en Ontario, en Alberta et ailleurs au Canada.<\/p>\n\n\n\n<p>En Colombie-Britannique, d\u2019importantes consultations ont \u00e9t\u00e9 men\u00e9es en 2024 entre le Ministry of Attorney General (minist\u00e8re du Procureur g\u00e9n\u00e9ral) et les intervenants du secteur<a href=\"#_ftn14\" id=\"_ftnref14\">[14]<\/a>. Le minist\u00e8re s\u2019affaire maintenant \u00e0 pr\u00e9parer une proposition l\u00e9gislative qui sera ensuite soumise \u00e0 l\u2019examen du gouvernement provincial<a href=\"#_ftn15\" id=\"_ftnref15\">[15]<\/a>. En attendant la promulgation de cette nouvelle loi, les privil\u00e8ges de construction en Colombie-Britannique demeurent r\u00e9gis par la <a href=\"https:\/\/www.canlii.org\/en\/bc\/laws\/stat\/sbc-1997-c-45\/latest\/sbc-1997-c-45.html\"><em>Builders Lien Act<\/em><\/a><a href=\"#_ftn16\" id=\"_ftnref16\">[16]<\/a>.<\/p>\n\n\n\n<p>De m\u00eame, \u00e0 Terre-Neuve-et-Labrador, le gouvernement a fait appel \u00e0 des intervenants du secteur concernant la mise en place \u00e9ventuelle d\u2019un r\u00e9gime similaire, une d\u00e9marche qui a \u00e9t\u00e9 accueillie tr\u00e8s favorablement par le secteur<a href=\"#_ftn17\" id=\"_ftnref17\">[17]<\/a>. En revanche, l\u2019\u00cele-du-Prince-\u00c9douard ne pr\u00e9voit pas adopter de loi sur le paiement rapide et continue d\u2019appliquer sa <a href=\"https:\/\/www.canlii.org\/en\/pe\/laws\/stat\/rspei-1988-c-m-4\/latest\/rspei-1988-c-m-4.html?resultId=da8f7196de8943c8894f07b2a4e9f378&amp;searchId=2025-09-02T15:24:11:884\/aabf50d4d43e413382c1d56c332f2c0c\"><em>Mechanics\u2019 Lien Act<\/em><\/a><a href=\"#_ftn18\" id=\"_ftnref18\">[18]<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Principaux points \u00e0 retenir pour les professionnels de la construction&nbsp;: meilleures pratiques du Canada<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Comprenez le concept de \u00ab&nbsp;facture en bonne et due forme&nbsp;\u00bb.<\/strong> Chaque province qui adopte un r\u00e9gime de paiement rapide met l\u2019accent sur la n\u00e9cessit\u00e9 de remettre des <em>factures en bonne et due forme<\/em>. Assurez-vous que votre \u00e9quipe conna\u00eet les \u00e9l\u00e9ments d\u2019information \u00e0 inclure (dates, descriptions, certifications, etc.). Les factures incompl\u00e8tes risquent de retarder le paiement.<\/li>\n\n\n\n<li><strong>Surveillez les d\u00e9lais de pr\u00e8s<\/strong>. Les r\u00e9gimes de paiement rapide imposent des <strong>d\u00e9lais stricts<\/strong>. Si vous ne respectez pas le d\u00e9lai impos\u00e9 pour effectuer un paiement, contester une facture ou pr\u00e9server un privil\u00e8ge, vous risquez de perdre votre pouvoir de n\u00e9gociation, voire vos droits.<\/li>\n\n\n\n<li><strong>Pr\u00e9parez-vous \u00e0 l\u2019arbitrage<\/strong>. L\u2019arbitrage se veut un processus rapide, ex\u00e9cutoire et cibl\u00e9. Conservez en dossier l\u2019ensemble des communications, changements et diff\u00e9rends afin d\u2019\u00eatre pr\u00eat \u00e0 intervenir si une proc\u00e9dure d\u2019arbitrage est enclench\u00e9e en cours de projet.<\/li>\n\n\n\n<li><strong>Soyez au fait de la position de votre province<\/strong>. L\u2019Ontario, la Saskatchewan, l\u2019Alberta, le Manitoba et les Territoires du Nord-Ouest ont d\u00e9j\u00e0 mis en place un r\u00e9gime de cette nature. La Nouvelle-\u00c9cosse et le Nouveau-Brunswick se pr\u00e9parent \u00e0 lancer le leur. La Colombie-Britannique et Terre-Neuve-et-Labrador en sont au stade de la consultation. Les r\u00e8gles diff\u00e8rent d\u2019une province \u00e0 l\u2019autre \u2013 ne pr\u00e9sumez pas que toutes les lois sont identiques.<\/li>\n\n\n\n<li><strong>Pr\u00e9voyez des flux de tr\u00e9sorerie en cons\u00e9quence<\/strong>. Les r\u00e9gimes de paiement rapide visent \u00e0 prot\u00e9ger les entrepreneurs et les sous-traitants contre les retards de paiement, mais la pression se fera \u00e9galement sentir par les propri\u00e9taires. \u00c9tablissez des pr\u00e9visions de flux de tr\u00e9sorerie r\u00e9alistes qui tiennent compte de ces d\u00e9lais.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion <\/h2>\n\n\n\n<p>Les r\u00e9gimes de paiement rapide remod\u00e8lent le secteur canadien de la construction, bien que, dans la pratique, leur impact ne soit pas encore tangible. \u00c9tant donn\u00e9 le petit nombre d\u2019interpr\u00e9tations judiciaires recens\u00e9es \u00e0 ce jour, les entrepreneurs et les propri\u00e9taires doivent surveiller attentivement les modifications apport\u00e9es \u00e0 la loi afin de s\u2019assurer de la respecter et de prot\u00e9ger leurs droits. Il ne fait aucun doute, cependant, que ces nouvelles lois transforment d\u00e9j\u00e0 les pratiques de paiement, r\u00e9duisent l\u2019incertitude li\u00e9e aux flux de tr\u00e9sorerie et acc\u00e9l\u00e8rent les processus de r\u00e9solution des diff\u00e9rends.<\/p>\n\n\n\n<p>Si vous souhaitez adopter un mode proactif \u00e0 l\u2019\u00e9gard de ces changements, que ce soit en mettant \u00e0 jour vos contrats, en r\u00e9visant vos pratiques de facturation ou en vous pr\u00e9parant en vue d\u2019une \u00e9ventuelle proc\u00e9dure d\u2019arbitrage, n\u2019h\u00e9sitez pas \u00e0 communiquer avec un membre du groupe <a href=\"https:\/\/www.millerthomson.com\/fr\/secteurs\/construction-et-infrastructures\/\">Construction et infrastructures<\/a> de Miller Thomson. Nous sommes l\u00e0 pour vous aider \u00e0 construire sur des bases solides.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><a href=\"#_ftnref1\" id=\"_ftn1\">[1]<\/a> Projet de loi&nbsp;216, <em>Loi de 2024 visant \u00e0 b\u00e2tir un Ontario fort ensemble (mesures budg\u00e9taires), <\/em>premi\u00e8re session, 43<sup>e<\/sup> l\u00e9gislature, Ontario, 2024 (sanction royale re\u00e7ue le 6&nbsp;d\u00e9cembre&nbsp;2024) chapitre&nbsp;20 des Lois de l\u2019Ontario de 2024.<\/p>\n\n\n\n<p><a href=\"#_ftnref2\" id=\"_ftn2\">[2]<\/a> <em>The Builders\u2019 Lien (Prompt Payment) Amendment Act, 2019, <\/em>SS 2019, c. 2.<\/p>\n\n\n\n<p><a href=\"#_ftnref3\" id=\"_ftn3\">[3]<\/a> <em>The Builders\u2019 Lien Act, <\/em>SS 1984-85-86, c. B-7.1.<\/p>\n\n\n\n<p><a href=\"#_ftnref4\" id=\"_ftn4\">[4]<\/a> <em>Prompt Payment and Construction Lien Act<\/em>, RSA 2000, c. P-26.4.<\/p>\n\n\n\n<p><a href=\"#_ftnref5\" id=\"_ftn5\">[5]<\/a> Projet de loi&nbsp;30, <em>Service Alberta Statutes Amendment Act, 2024<\/em>, 1<sup>re<\/sup>&nbsp;session, 31<sup>e<\/sup>&nbsp;l\u00e9gislature, Alberta, 2024 (sanction royale re\u00e7ue le 5&nbsp;d\u00e9cembre&nbsp;2024, parties&nbsp;2 et 3 adopt\u00e9es le 1<sup>er<\/sup>&nbsp;avril&nbsp;2025).<\/p>\n\n\n\n<p><a href=\"#_ftnref6\" id=\"_ftn6\">[6]<\/a> Nouvelle-\u00c9cosse, 1<sup>re<\/sup>&nbsp;session, 64<sup>e<\/sup> assembl\u00e9e g\u00e9n\u00e9rale, projet de loi&nbsp;211, \u00ab&nbsp;An Act to Amend Chapter 277 of the<br>&nbsp;Revised Statutes, 1989, the Builders\u2019 Lien Act&nbsp;\u00bb.<\/p>\n\n\n\n<p><a href=\"#_ftnref7\" id=\"_ftn7\">[7]<\/a> <em>Builders\u2019 Lien Act (modifi\u00e9e)<\/em>, SNS 2022, c.&nbsp;43.<\/p>\n\n\n\n<p><a href=\"#_ftnref8\" id=\"_ftn8\">[8]<\/a> Gouvernement de la Nouvelle-\u00c9cosse, \u00ab&nbsp;Prompt payment and dispute resolution for the construction industry:<br>engagement&nbsp;\u00bb (consult\u00e9 le 11&nbsp;juin&nbsp;2025), en ligne&nbsp;: &lt;https:\/\/novascotia.ca\/prompt-payment-engagement\/&gt;.<\/p>\n\n\n\n<p><a href=\"#_ftnref9\" id=\"_ftn9\">[9]<\/a> <em>The Builders\u2019 Liens Amendment Act (Prompt Payment), <\/em>SM 2023, c.&nbsp;30.<\/p>\n\n\n\n<p><a href=\"#_ftnref10\" id=\"_ftn10\">[10]<\/a> <em>Builders\u2019 Liens Act<\/em>, CCSM, c.&nbsp;B91.<\/p>\n\n\n\n<p><a href=\"#_ftnref11\" id=\"_ftn11\">[11]<\/a> <em>Loi sur les paiements rapides et les r\u00e8glements des diff\u00e9rends dans le secteur de la construction<\/em>, LN-B 2023, c.&nbsp;15.<\/p>\n\n\n\n<p><a href=\"#_ftnref12\" id=\"_ftn12\">[12]<\/a> <em>Loi sur les paiements rapides et les r\u00e8glements des diff\u00e9rends dans le secteur de la construction<\/em>, LN-B 2023, c.&nbsp;15, art.&nbsp;23.<\/p>\n\n\n\n<p><a href=\"#_ftnref13\" id=\"_ftn13\">[13]<\/a> <em>Loi sur les privil\u00e8ges de construction<\/em>, LTNO 2023, c.&nbsp;24.<\/p>\n\n\n\n<p><a href=\"#_ftnref14\" id=\"_ftn14\">[14]<\/a> \u00ab&nbsp;Prompt Payment: Industry Priority&nbsp;\u00bb, <em>British Columbia Construction Association<\/em> (ao\u00fbt&nbsp;2025), en ligne&nbsp;:<br>https:\/\/bccassn.com\/industry-priorities\/prompt-payment\/.<\/p>\n\n\n\n<p><a href=\"#_ftnref15\" id=\"_ftn15\">[15]<\/a> <em>Mechanics\u2019 Lien Act, <\/em>RSPEI 1988, c. M-4; RSNL 1990, c. M-3.<\/p>\n\n\n\n<p><a href=\"#_ftnref16\" id=\"_ftn16\">[16]<\/a> <em>Builders Lien Act, <\/em>SBC 1997, c. 45.<\/p>\n\n\n\n<p><a href=\"#_ftnref17\" id=\"_ftn17\">[17]<\/a> Terre-Neuve-et-Labrador, \u00ab&nbsp;What We Heard: Consultations on the Mechanics\u2019 Lien Act&nbsp;\u00bb (ao\u00fbt&nbsp;2024), en ligne&nbsp;: &lt;https:\/\/www.gov.nl.ca\/dgsnl\/files\/Mechanics-Lien-Act-Consultations-What-We-Heard.pdf&gt;.<\/p>\n\n\n\n<p><a href=\"#_ftnref18\" id=\"_ftn18\">[18]<\/a> <em>Mechanics\u2019 Lien Act, <\/em>RSPEI 1988, c. M-4.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><a id=\"_msocom_1\"><\/a><a id=\"_msocom_2\"><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les retards de paiement figurent parmi les risques qui p\u00e8sent le plus lourdement sur les projets de constructions, allant m\u00eame jusqu\u2019\u00e0 causer des probl\u00e8mes de flux de tr\u00e9sorerie susceptibles de bouleverser les calendriers et de mettre \u00e0 mal les relations. Pour rem\u00e9dier \u00e0 la situation, de nombreuses provinces canadiennes ont adopt\u00e9 \u2013 ou entrepris d\u2019adopter [&hellip;]<\/p>\n","protected":false},"author":122,"featured_media":32408,"parent":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[592],"insight-format":[470],"class_list":["post-40715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bulletin-droit-de-la-construction-et-fr"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada? | Miller Thomson<\/title>\n<meta name=\"description\" content=\"Paiement rapide en construction : comprendre les nouvelles obligations, les d\u00e9lais stricts et les risques li\u00e9s aux factures et aux privil\u00e8ges au Canada.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada? | Miller Thomson\" \/>\n<meta property=\"og:description\" content=\"Paiement rapide en construction : comprendre les nouvelles obligations, les d\u00e9lais stricts et les risques li\u00e9s aux factures et aux privil\u00e8ges au Canada.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/\" \/>\n<meta property=\"og:site_name\" content=\"Miller Thomson\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MillerThomsonLaw\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-10T18:41:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-25T17:27:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1098\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sebastian Vives\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@millerthomson\" \/>\n<meta name=\"twitter:site\" content=\"@millerthomson\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sebastian Vives\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/\"},\"author\":{\"name\":\"Sebastian Vives\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/be05481ca4ee617c24b33993ade4c881\"},\"headline\":\"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada?\",\"datePublished\":\"2025-09-10T18:41:54+00:00\",\"dateModified\":\"2025-11-25T17:27:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/\"},\"wordCount\":2703,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg\",\"articleSection\":[\"Bulletin droit de la construction et infrastructures\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#respond\"]}]},{\"@type\":[\"WebPage\",\"ItemPage\"],\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/\",\"url\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/\",\"name\":\"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada? | Miller Thomson\",\"isPartOf\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg\",\"datePublished\":\"2025-09-10T18:41:54+00:00\",\"dateModified\":\"2025-11-25T17:27:33+00:00\",\"description\":\"Paiement rapide en construction : comprendre les nouvelles obligations, les d\u00e9lais stricts et les risques li\u00e9s aux factures et aux privil\u00e8ges au Canada.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage\",\"url\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg\",\"contentUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg\",\"width\":1920,\"height\":1098,\"caption\":\"welder standing on steel beams\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.millerthomson.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#website\",\"url\":\"https:\/\/www.millerthomson.com\/fr\/\",\"name\":\"Miller Thomson | Cabinet de droit des affaires pancanadien\",\"description\":\"National law firm providing business law expertise and litigation and disputes services for businesses across Canada since 1957.\",\"publisher\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.millerthomson.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#organization\",\"name\":\"Miller Thomson | Cabinet de droit des affaires pancanadien\",\"url\":\"https:\/\/www.millerthomson.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg\",\"contentUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg\",\"width\":380,\"height\":50,\"caption\":\"Miller Thomson | Cabinet de droit des affaires pancanadien\"},\"image\":{\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/MillerThomsonLaw\/\",\"https:\/\/x.com\/millerthomson\",\"https:\/\/www.linkedin.com\/company\/miller-thomson-llp\/\",\"https:\/\/www.youtube.com\/@millerthomson\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/be05481ca4ee617c24b33993ade4c881\",\"name\":\"Sebastian Vives\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9c50194d3d05da0f277cc6ce0c163d04a4150aed35e0d008c0cba4866c37cc31?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9c50194d3d05da0f277cc6ce0c163d04a4150aed35e0d008c0cba4866c37cc31?s=96&d=mm&r=g\",\"caption\":\"Sebastian Vives\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada? | Miller Thomson","description":"Paiement rapide en construction : comprendre les nouvelles obligations, les d\u00e9lais stricts et les risques li\u00e9s aux factures et aux privil\u00e8ges au Canada.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/","og_locale":"fr_FR","og_type":"article","og_title":"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada? | Miller Thomson","og_description":"Paiement rapide en construction : comprendre les nouvelles obligations, les d\u00e9lais stricts et les risques li\u00e9s aux factures et aux privil\u00e8ges au Canada.","og_url":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/","og_site_name":"Miller Thomson","article_publisher":"https:\/\/www.facebook.com\/MillerThomsonLaw\/","article_published_time":"2025-09-10T18:41:54+00:00","article_modified_time":"2025-11-25T17:27:33+00:00","og_image":[{"width":1920,"height":1098,"url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg","type":"image\/jpeg"}],"author":"Sebastian Vives","twitter_card":"summary_large_image","twitter_creator":"@millerthomson","twitter_site":"@millerthomson","twitter_misc":{"Written by":"Sebastian Vives","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#article","isPartOf":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/"},"author":{"name":"Sebastian Vives","@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/be05481ca4ee617c24b33993ade4c881"},"headline":"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada?","datePublished":"2025-09-10T18:41:54+00:00","dateModified":"2025-11-25T17:27:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/"},"wordCount":2703,"commentCount":0,"publisher":{"@id":"https:\/\/www.millerthomson.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage"},"thumbnailUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg","articleSection":["Bulletin droit de la construction et infrastructures"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#respond"]}]},{"@type":["WebPage","ItemPage"],"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/","url":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/","name":"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada? | Miller Thomson","isPartOf":{"@id":"https:\/\/www.millerthomson.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage"},"image":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage"},"thumbnailUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg","datePublished":"2025-09-10T18:41:54+00:00","dateModified":"2025-11-25T17:27:33+00:00","description":"Paiement rapide en construction : comprendre les nouvelles obligations, les d\u00e9lais stricts et les risques li\u00e9s aux factures et aux privil\u00e8ges au Canada.","breadcrumb":{"@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#primaryimage","url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg","contentUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2025\/04\/insights_construction-welder.jpg","width":1920,"height":1098,"caption":"welder standing on steel beams"},{"@type":"BreadcrumbList","@id":"https:\/\/www.millerthomson.com\/fr\/perspectives-juridiques\/bulletin-droit-de-la-construction-et-fr\/privileges-de-construction-et-paiement-rapide-examen-des-changements-apportes-a-la-legislation-a-lechelle-nationale\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.millerthomson.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Paiement rapide, hypoth\u00e8ques l\u00e9gales de construction et adjudication : o\u00f9 en est la l\u00e9gislation au Canada?"}]},{"@type":"WebSite","@id":"https:\/\/www.millerthomson.com\/fr\/#website","url":"https:\/\/www.millerthomson.com\/fr\/","name":"Miller Thomson | Cabinet de droit des affaires pancanadien","description":"National law firm providing business law expertise and litigation and disputes services for businesses across Canada since 1957.","publisher":{"@id":"https:\/\/www.millerthomson.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.millerthomson.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.millerthomson.com\/fr\/#organization","name":"Miller Thomson | Cabinet de droit des affaires pancanadien","url":"https:\/\/www.millerthomson.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg","contentUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg","width":380,"height":50,"caption":"Miller Thomson | Cabinet de droit des affaires pancanadien"},"image":{"@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/MillerThomsonLaw\/","https:\/\/x.com\/millerthomson","https:\/\/www.linkedin.com\/company\/miller-thomson-llp\/","https:\/\/www.youtube.com\/@millerthomson"]},{"@type":"Person","@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/be05481ca4ee617c24b33993ade4c881","name":"Sebastian Vives","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.millerthomson.com\/fr\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9c50194d3d05da0f277cc6ce0c163d04a4150aed35e0d008c0cba4866c37cc31?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9c50194d3d05da0f277cc6ce0c163d04a4150aed35e0d008c0cba4866c37cc31?s=96&d=mm&r=g","caption":"Sebastian Vives"}}]}},"_links":{"self":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/posts\/40715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/users\/122"}],"replies":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/comments?post=40715"}],"version-history":[{"count":0,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/posts\/40715\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/media\/32408"}],"wp:attachment":[{"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/media?parent=40715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/categories?post=40715"},{"taxonomy":"insight-format","embeddable":true,"href":"https:\/\/www.millerthomson.com\/fr\/wp-json\/wp\/v2\/insight-format?post=40715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}