{"id":5191,"date":"2017-07-20T17:03:03","date_gmt":"2017-07-20T21:03:03","guid":{"rendered":"https:\/\/www.millerthomson.com\/green-changes-announced-ontario-building-code-2\/"},"modified":"2024-09-16T11:04:57","modified_gmt":"2024-09-16T15:04:57","slug":"green-changes-announced-ontario-building-code-2","status":"publish","type":"post","link":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/","title":{"rendered":"\u201cGreen\u201d Changes Announced for Ontario Building Code"},"content":{"rendered":"<p>On July 14, 2017, the Ministry of Municipal Affairs announced the replacement of the Ontario Building Code, effective January 1, 2019. The changes are being made to include new requirements supporting the government\u2019s Climate Change Action Plan (CCAP) of June 2016, with a view to reducing GHG emissions and implementing energy-efficient measures in new homes and large buildings. The concept is to bring these structures closer to being \u201cnet-zero energy buildings\u201d (NZEB) \u2013 where the energy used by the building is equal to the amount of renewable energy created on site. Affected parties including designers, builders, contractors, and installers should take note of these significant changes being considered.<\/p>\n<h2>Requirement of \u201cSolar-Ready\u201d Roofs and Conduits<\/h2>\n<p>One of the major themes from the proposed changes is to institute requirements during the installation stage of new houses and large buildings that will make them ready to be \u201cnet zero\u201d in the future. There are two amendments with this objective in mind: (i) adding a loading requirement to roofing designs for all new large buildings that makes possible the future addition of solar technology; and (ii) the requirement of a conduit on all new houses and large buildings to facilitate the installation of a photovoltaic system or a solar domestic hot water system.<\/p>\n<p>The current version of the Building Code does not require these facilitating measures be in place. The rationale for these proposed changes is that, currently, when solar voltaic panels are added to an existing building, the construction costs can be huge. These amendments would require that certain upfront costs be incurred during the construction phase \u2013 ensuring large building roofs are able to support a larger dead load allowing for the weight of a future installation of a PV or solar hot water system, and of installing conduits on all new houses and buildings.<\/p>\n<p>The loading requirement for roofing designs will only be waived in circumstances where the solar collection system is not practical, including roofing areas occupied by mechanical equipment, vegetative or high-reflectance roofs, roof area that is largely shaded, roof area that is sloped or oriented to make solar collection impractical, and roof area used for paths of travel.<\/p>\n<p>National Resources Canada partnered with the Canadian Solar Industries Association to explore this \u201csolar-ready\u201d concept and created Solar Ready Guidelines.<a href=\"#_ftn1\" name=\"_ftnref1\">[1]<\/a> Builder-led pilot projects were done to explore the solar-ready concept. The findings were that a few simple, inexpensive design modifications made \u201cup front\u201d in the design and construction phase of a new home enabled building owners to significantly save on future installation costs of a solar domestic hot water system or photovoltaic system. Specifically, it found that for an average home, homeowners could expect to save about $1,000 on the installation of a solar domestic hot water system or a solar PV system in a home built \u201csolar-ready\u201d versus a home without these features.<a href=\"#_ftn2\" name=\"_ftnref2\">[2]<\/a><\/p>\n<h2>Reduction of Trade-offs between Building Envelope and Heating Systems for Energy Efficiency Compliance<\/h2>\n<p>Another significant proposed change is with regard to the energy efficiency requirements under the Ontario Building Code, as set out in the Supplementary Standard SB-12 \u201cEnergy Efficiency for Housing.\u201d The change would reduce, starting in 2020, the possibilities for trade-offs between components of building envelopes and heating systems, eventually eliminating the practice of these trade-offs altogether by 2022.<\/p>\n<p>Currently, houses can meet the energy efficiency requirements by following either the prescriptive-based approach or the performance-based approach in SB-12. Prescriptive compliance means that the thermal performance and energy efficiency of both the building envelope and the mechanical equipment (including space heating equipment, hot water heating equipment, and heat recovery ventilators) must conform to a certain compliance package with specified requirements for each component. Performance compliance means the builder must only ensure that the overall energy use of the house does not exceed the amount of energy it would use if it was designed according to a select prescriptive compliance package; but how this is distributed amongst the various components is up to the builder to decide. This greater flexibility thus allows builders to make trade-offs between building envelopes and mechanical equipment, which often results in the substituting of a highly energy-efficient heating system with a poorly-performing building envelope.<\/p>\n<p>A recent <em>Globe and Mail<\/em> article entitled \u201cOntario Looks to Close Loophole on Energy Standards for Buildings\u201d discussed that many condominium and apartment building developers are exploiting the flexibility provided under the current rules.<a href=\"#_ftn3\" name=\"_ftnref3\">[3]<\/a> Developers are able to meet energy targets by installing ultra-efficient mechanical heating and ventilation systems as a \u201ctrade-off\u201d against the use of one of the least energy-efficient materials for its building envelope \u2013 floor-to-ceiling windows. This practice has the effect of undermining the energy efficiency of these new large buildings which are able to \u201csqueak by\u201d the energy efficiency standards, but whose building envelopes are overall low-performing in thermal and energy efficiency.<\/p>\n<p>The proposed amendment will reduce the potential for these trade-offs with the view that it will highlight the critical role of the building envelope in making new buildings as efficient as possible in terms of energy use and GHG emissions. As of 2022, these trade-offs will be altogether eliminated, so that builders can only substitute building envelope components for other building envelope components. For example, a window with a lower-than-required performance level can be substituted for insulation that has a higher than required R-value but it cannot be substituted for a higher performing heating system.<\/p>\n<h2>Requirement of Heat or Energy Recovery Units in all Buildings<\/h2>\n<p>Another amendment, to be in effect by 2022, is that all apartment buildings and condominiums will be required to have a heat or energy recovery unit as part of their ventilation system. The rationale for this change is that due to recent efforts at reducing air leakage in new buildings, air tightness in new homes and buildings has significantly increased to the extent that air leakage, as well as the supply air for exhaust ventilation systems, is now reduced. A heat or energy recovery ventilator can address these issues as it provides a controlled amount of fresh air through a mechanical ventilation system. The purpose of a heat recovery unit is to remove moisture and provide fresh air to buildings in order to maintain good indoor air quality. Air quality is important not just for human health reasons, but also for energy efficiency and cost-savings, as it reduces heating costs by not heating excess water vapour in the air (heating moist air eats up more energy). Although there will be upfront installation costs for these units, it is expected that the saved heating costs over time will make them cost-efficient and have a payback period shorter than their expected lifetime.<\/p>\n<h2>Encouraging Greywater Reuse Systems<\/h2>\n<p>One of the proposed changes to the Building Code is to facilitate greywater reuse systems. Greywater systems are a form of decentralized water reuse where the system is maintained by the property owner or manager and the collected water is reused on site.<a href=\"#_ftn4\" name=\"_ftnref4\">[4]<\/a> There are cost benefits for the user, as there will be lower payments for water, system benefits, as the re-used water does not have to be transported through the water infrastructure (the sewage system), and environmental benefits, as there is, obviously, lower water source withdrawal, as well as lower energy use.<\/p>\n<p>\u201cFacilitation\u201d of these systems in the new Building Code will be in the form of adopting a new standard for greywater reuse created by the Canadian Standards Association \u2013 the CAN\/CSA-B128.3 Standard \u2013 which references the quality of water required for greywater reuse systems. The current Building Code only references one CAN\/CSA standard, which is focused mainly on the design and installation portions of greywater systems.<\/p>\n<p>The hope is that with implementing such a standard controlling the quality of water, users\u2019 and consumers\u2019 concerns about health, safety, and sanitation with Greywater reuse systems will be allayed, and these systems will become more commonplace.<\/p>\n<p>A recent study done by the Priority Green Clarington demonstration project and reported on by the Environmental Commissioner of Ontario in its 2016\/2017 report found that compared to other water-saving technologies, the Greywater system delivered the largest water savings \u2013 at 13 litres per person per day, providing more than 50% of the water needed for toilet flushing.<a href=\"#_ftn5\" name=\"_ftnref5\">[5]<\/a> Unfortunately, such systems are not yet cost-efficient, due to their high upfront cost, including installation of a dual plumbing system.<a href=\"#_ftn6\" name=\"_ftnref6\">[6]<\/a><\/p>\n<p>It is unknown whether this addition of a new water quality standard will be enough to encourage users to install and retrofit these expensive greywater systems. This change is to be in effect in 2019, although it is anticipated that there will be a negative reaction to this initiative from municipalities, who based their capital expenditures on water and wastewater treatment systems on the current model of water usage.<\/p>\n<p>Other potential changes proposed for the new Building Code include: continuous insulation requirements; energy-efficient windows and sliding doors requirements; and air leakage testing and air tightness requirements.<\/p>\n<h2>Conclusion<\/h2>\n<p>The Ministry is encouraging comments to be posted on their site during the 77-day comment period, which closes September 29, 2017. Following this period, Technical Advisory Committees of Building Code experts will meet to offer advice on the proposals, which are anticipated to begin coming into effect as of January 1, 2019. However, with a provincial election scheduled for spring 2018, it is unknown whether some or all of these changes will actually be put in place.<\/p>\n<p>&nbsp;<\/p>\n<p>_______________________________<br \/>\n<span style=\"font-size: 85%;\"><br \/>\n<a href=\"#_ftnref1\" name=\"_ftn1\">[1]<\/a> \u201cSolar Ready Guidelines for Solar Domestic Hot water and Photovoltaic Systems\u201d, <em>National Resources Canada,<\/em> CanmetENERGY Housing, Buildings, and Communities, Version 1.1 &lt;<a href=\"http:\/\/www.nrcan.gc.ca\/sites\/www.nrcan.gc.ca\/files\/canmetenergy\/files\/pubs\/SolarReadyGuidelines_en.pdf\">http:\/\/www.nrcan.gc.ca\/sites\/www.nrcan.gc.ca\/files\/canmetenergy\/files\/pubs\/SolarReadyGuidelines_en.pdf<\/a>,&gt; online.<\/span><\/p>\n<p><span style=\"font-size: 85%;\"><a href=\"#_ftnref2\" name=\"_ftn2\">[2]<\/a> <em>Ibid<\/em>, at page 16.<\/span><\/p>\n<p><span style=\"font-size: 85%;\"><a href=\"#_ftnref3\" name=\"_ftn3\">[3]<\/a> Lorinc, John: \u201cOntario Looks to Close Loophole on Energy Standards for Buildings\u201d, <em>The Globe and Mail<\/em>, published March 16, 2016,&lt;<a href=\"https:\/\/www.theglobeandmail.com\/life\/home-and-garden\/architecture\/ontario-looks-to-close-loophole-on-energy-standards-for-buildings\/article29261814\/:\/\">https:\/\/www.theglobeandmail.com\/life\/home-and-garden\/architecture\/ontario-looks-to-close-loophole-on-energy-standards-for-buildings\/article29261814\/:\/<\/a> &gt;, online.<\/span><\/p>\n<p><span style=\"font-size: 85%;\"><a href=\"#_ftnref4\" name=\"_ftn4\">[4]<\/a> \u201cEvery Drop Counts: Reducing the Energy and Climate Footprint of Ontario\u2019s Water Use\u201d, <em>Annual Energy Conservation Progress Report by the Environmental Commissioner of Ontario<\/em>, 2016\/2017 (Vol 1), &lt;<a href=\"http:\/\/docs.assets.eco.on.ca\/reports\/energy\/2016-2017\/Every-Drop-Counts.pdf\">http:\/\/docs.assets.eco.on.ca\/reports\/energy\/2016-2017\/Every-Drop-Counts.pdf<\/a>&gt;, online, at page 86.<\/span><\/p>\n<p><span style=\"font-size: 85%;\"><a href=\"#_ftnref5\" name=\"_ftn5\">[5]<\/a> <em>Ibid<\/em>, at page 88.<\/span><\/p>\n<p><span style=\"font-size: 85%;\"><a href=\"#_ftnref6\" name=\"_ftn6\">[6]<\/a> <em>Ibid<\/em>.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On July 14, 2017, the Ministry of Municipal Affairs announced the replacement of the Ontario Building Code, effective January 1, 2019. The changes are being made to include new requirements supporting the government\u2019s Climate Change Action Plan (CCAP) of June 2016, with a view to reducing GHG emissions and implementing energy-efficient measures in new homes [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":14341,"parent":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[539],"insight-format":[416],"class_list":["post-5191","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-and-infrastructure-law"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u201cGreen\u201d Changes Announced for Ontario Building Code | Miller Thomson<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u201cGreen\u201d Changes Announced for Ontario Building Code | Miller Thomson\" \/>\n<meta property=\"og:description\" content=\"On July 14, 2017, the Ministry of Municipal Affairs announced the replacement of the Ontario Building Code, effective January 1, 2019. The changes are being made to include new requirements supporting the government\u2019s Climate Change Action Plan (CCAP) of June 2016, with a view to reducing GHG emissions and implementing energy-efficient measures in new homes [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Miller Thomson\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MillerThomsonLaw\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-07-20T21:03:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-16T15:04:57+00:00\" \/>\n<meta name=\"author\" content=\"Katherine Chan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@millerthomson\" \/>\n<meta name=\"twitter:site\" content=\"@millerthomson\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katherine Chan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/\"},\"author\":{\"name\":\"Katherine Chan\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/#\/schema\/person\/5473b50a564d1e37f327fdd79cb348f6\"},\"headline\":\"\u201cGreen\u201d Changes Announced for Ontario Building Code\",\"datePublished\":\"2017-07-20T21:03:03+00:00\",\"dateModified\":\"2024-09-16T15:04:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/\"},\"wordCount\":1663,\"publisher\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"articleSection\":[\"Construction and Infrastructure Law\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"ItemPage\"],\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/\",\"url\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/\",\"name\":\"\u201cGreen\u201d Changes Announced for Ontario Building Code | Miller Thomson\",\"isPartOf\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"datePublished\":\"2017-07-20T21:03:03+00:00\",\"dateModified\":\"2024-09-16T15:04:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage\",\"url\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"contentUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg\",\"width\":1776,\"height\":994,\"caption\":\"three people wearing hardhats standing at a construction site\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.millerthomson.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u201cGreen\u201d Changes Announced for Ontario Building Code\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/#website\",\"url\":\"https:\/\/www.millerthomson.com\/en\/\",\"name\":\"Miller Thomson\",\"description\":\"National law firm providing business law expertise and litigation and disputes services for businesses across Canada since 1957.\",\"publisher\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.millerthomson.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/#organization\",\"name\":\"Miller Thomson\",\"url\":\"https:\/\/www.millerthomson.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg\",\"contentUrl\":\"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg\",\"width\":380,\"height\":50,\"caption\":\"Miller Thomson\"},\"image\":{\"@id\":\"https:\/\/www.millerthomson.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/MillerThomsonLaw\/\",\"https:\/\/x.com\/millerthomson\",\"https:\/\/www.linkedin.com\/company\/miller-thomson-llp\/\",\"https:\/\/www.youtube.com\/@millerthomson\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/#\/schema\/person\/5473b50a564d1e37f327fdd79cb348f6\",\"name\":\"Katherine Chan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.millerthomson.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g\",\"caption\":\"Katherine Chan\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u201cGreen\u201d Changes Announced for Ontario Building Code | Miller Thomson","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/","og_locale":"en_US","og_type":"article","og_title":"\u201cGreen\u201d Changes Announced for Ontario Building Code | Miller Thomson","og_description":"On July 14, 2017, the Ministry of Municipal Affairs announced the replacement of the Ontario Building Code, effective January 1, 2019. The changes are being made to include new requirements supporting the government\u2019s Climate Change Action Plan (CCAP) of June 2016, with a view to reducing GHG emissions and implementing energy-efficient measures in new homes [&hellip;]","og_url":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/","og_site_name":"Miller Thomson","article_publisher":"https:\/\/www.facebook.com\/MillerThomsonLaw\/","article_published_time":"2017-07-20T21:03:03+00:00","article_modified_time":"2024-09-16T15:04:57+00:00","author":"Katherine Chan","twitter_card":"summary_large_image","twitter_creator":"@millerthomson","twitter_site":"@millerthomson","twitter_misc":{"Written by":"Katherine Chan","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#article","isPartOf":{"@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/"},"author":{"name":"Katherine Chan","@id":"https:\/\/www.millerthomson.com\/en\/#\/schema\/person\/5473b50a564d1e37f327fdd79cb348f6"},"headline":"\u201cGreen\u201d Changes Announced for Ontario Building Code","datePublished":"2017-07-20T21:03:03+00:00","dateModified":"2024-09-16T15:04:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/"},"wordCount":1663,"publisher":{"@id":"https:\/\/www.millerthomson.com\/en\/#organization"},"image":{"@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","articleSection":["Construction and Infrastructure Law"],"inLanguage":"en-US"},{"@type":["WebPage","ItemPage"],"@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/","url":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/","name":"\u201cGreen\u201d Changes Announced for Ontario Building Code | Miller Thomson","isPartOf":{"@id":"https:\/\/www.millerthomson.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage"},"image":{"@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","datePublished":"2017-07-20T21:03:03+00:00","dateModified":"2024-09-16T15:04:57+00:00","breadcrumb":{"@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#primaryimage","url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","contentUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/Insights_Construction-Infrastructure_Post-Image.jpg","width":1776,"height":994,"caption":"three people wearing hardhats standing at a construction site"},{"@type":"BreadcrumbList","@id":"https:\/\/www.millerthomson.com\/en\/insights\/construction-and-infrastructure-law\/green-changes-announced-ontario-building-code-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.millerthomson.com\/en\/"},{"@type":"ListItem","position":2,"name":"\u201cGreen\u201d Changes Announced for Ontario Building Code"}]},{"@type":"WebSite","@id":"https:\/\/www.millerthomson.com\/en\/#website","url":"https:\/\/www.millerthomson.com\/en\/","name":"Miller Thomson","description":"National law firm providing business law expertise and litigation and disputes services for businesses across Canada since 1957.","publisher":{"@id":"https:\/\/www.millerthomson.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.millerthomson.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.millerthomson.com\/en\/#organization","name":"Miller Thomson","url":"https:\/\/www.millerthomson.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.millerthomson.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg","contentUrl":"https:\/\/www.millerthomson.com\/wp-content\/uploads\/2024\/10\/miller-thomson.svg","width":380,"height":50,"caption":"Miller Thomson"},"image":{"@id":"https:\/\/www.millerthomson.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/MillerThomsonLaw\/","https:\/\/x.com\/millerthomson","https:\/\/www.linkedin.com\/company\/miller-thomson-llp\/","https:\/\/www.youtube.com\/@millerthomson"]},{"@type":"Person","@id":"https:\/\/www.millerthomson.com\/en\/#\/schema\/person\/5473b50a564d1e37f327fdd79cb348f6","name":"Katherine Chan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.millerthomson.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/da8a18c240b27905220d948a87957ba19ab6de326b44a2ce3072235c121f996f?s=96&d=mm&r=g","caption":"Katherine Chan"}}]}},"_links":{"self":[{"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/posts\/5191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/comments?post=5191"}],"version-history":[{"count":0,"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/posts\/5191\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/media\/14341"}],"wp:attachment":[{"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/media?parent=5191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/categories?post=5191"},{"taxonomy":"insight-format","embeddable":true,"href":"https:\/\/www.millerthomson.com\/en\/wp-json\/wp\/v2\/insight-format?post=5191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}